|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2022-06-16-PBC-min.rev
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2022
>
2022-06-16-PBC-min.rev
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2023 3:30:37 PM
Creation date
10/4/2022 4:12:04 PM
Metadata
Fields
Template:
Archives
Year
2022
Department
Town Clerk
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
911 is scheduled to move on 8/1. The Dispatch center will move on that day, the balance of the police station will follow <br />that week. <br /> <br />Police <br />Staff updated that the town wide referendum had passed on 6/6/22, approving the project funding. <br /> <br />The architects provided an update on the prequalification process that was nearing completion <br />Prequals <br />• Scoring Sheets were reviewed for all Firms submitting Qualifications. <br />• 10 General Contractors Submitted. Tentatively 9 out of 10 will be approved and able to provide a Bid on the <br />Project. <br />• 101 Subcontractor qualification statements were received, it is anticipated that we might only lose 1 or 2 in the <br />pre-qualification process. <br />• Elevator will end up being bid as an open filed sub bid, as there was only 1 respondent. <br />The Bidding Schedule was reviewed. <br />• The complete Bid Package is scheduled for release on or before 05 July, 2022 <br />• Filed Sub Bids to be received July 26, 2022 <br />• General Bids to be received August 9th, 2022 <br />A recap of the VE list was discussed and the final list previously shared in the minutes from 5-24-22 were discussed and <br />a copy is inserted here for reference: <br /> <br /> <br />It was requested to share this list with the Select Board, as well as a brief description of the bid process and schedule. <br /> <br />The Project Budget and some thoughts toward strategy if the bids were over budget were explored. Discussed were any <br />flexibilities that might exist in the current budget to allow an award to be made, pending how far over budget the Bids <br />were and whether FF&E items currently in the construction bid documents might be better handled directly by the Owner <br />(such as compact shelving etc.). <br /> <br />Staff outlined that some possibilities exist however it depends wholly on how over budget the bid might be. <br />Next meeting scheduled for 7-14-22. <br />Motion made and Seconded to Adjourn. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.