<br /> <br />Bid Documents & Bidding. <br /> <br />• DPF reported that they have just completed a review of the Mechanical, Electrical & Plumbing documents and <br />returned those comments to Tecton Architects. <br />• Our Commissioning Agent has also completed a review of the MEP docs and those comments have been sent <br />to Tecton Architects as well. <br />• Staff has sent a set of General Conditions of the Contract and Contract Form to Town Counsel for review. <br />The complete Bid Package is scheduled by Tecton and ready for Bidding on or before 05 July, 2022 <br />• Filed Sub Bids Mid to Late July <br />• General Bids/Contract award Early to mid-August. <br /> <br />State is Scheduled to move the 911 system on 8/1/22, which would also necessitate a coordinated move of Police <br />Department around the 8/1 Dispatch date. <br /> <br />Staff reported that the project was tentatively going to be presented to the Select Board on 6/6/22 for approval to go <br />out to bid. <br /> <br />There was some discussion on the need to include some Bid Alternates to help ensure project continuance if the Bids <br />were to come in higher than anticipated. <br /> <br />A couple different methods of how we could manage costs if we were to receive a high bid. <br />• One was to agree that FF&E budget lines could be used to support the actual construction costs and seek <br />replacement of those funds in another way or simply reduce new FF&E plans. <br />• If we are to encounter contaminated or unsuitable soils, either manage those on site or find an alternative to <br />paying the high cost of trucking them off site. <br />• Include Additive alternates to keep the base bid as low as possible. <br /> <br />The 100% DD estimate, dated 31 January 2022, was identified to have a 5% Design and Bid allowance and a 7% <br />Escalation Allowance. <br />The Current rate of Escalation was discussed as being potentially up to 14% in some areas. The Current Budget <br />includes a $500,000 allowance to deal with unsuitable soils, a $300,000 allowance to deal with Hosmer House issues <br />and a $2,000,000 Construction contingency. (A question was asked if test pits and soil testing was completed. Staff <br />replied that test pits were dug, but status of testing needed to be investigated.) <br /> <br />Several possible alternates were discussed and PBC asked Staff to work with the Architect and come up with <br />approximately $450,000 in alternates, VE items, rejected VE that could become alternates, or new ideas that could be <br />implemented. <br /> <br /> <br />Comments & Questions <br />A question was asked about how the High School project will run if the School Building Committee (SBC) is not the <br />PBC, as it has been in past projects and how the PBC would then be involved. <br /> <br />Staff replied that it was envisioned that SBC and PBC would be working on parallel paths. SBC direction and focus will <br />be primarily education and program and their involvement would be greater at the beginning of the project and lesser <br />at the end. The PBC may have lesser involvement in the early stages while education programming and space needs <br /> are the primary focus and a greater involvement thru the Integrated design phase and overall building development, <br />just as they have on past projects. <br /> <br /> <br /> <br /> <br />