Laserfiche WebLink
COMMUNICATIONS ADVISORY COMMITTEE <br />MEETING MINUTES <br />ID Item Discussed Discussion/Conclusions Action Items Responsible Due Date <br />2 COMCAST Report <br />a. Lexington studio site <br />was surveyed for options <br />re: RCN Connection into <br />studio. <br />Ken Bates (Comcast <br />tech) will work with Bob <br />Hagwood (RCN Tech) to <br />work through the <br />details. <br />Jane Lyman <br />(Comcast) <br />b. RCN wasn't clear why <br />feed had to be from the <br />studio. <br />Nstar approval needed <br />to perform POLE work. <br />Tom Steel to contact <br />Andy Balstar (Nstar) to <br />work out scheduling of <br />work. <br />Tom Steel <br />(RCN) <br />Tom Steel <br />(RCN) <br />Town to make an Jeanne Krieger <br />additional request to <br />Nstar explaining <br />importance of <br />timeliness of work. <br />c. Comcast connection is <br />@ Cary Hall, but not IN <br />Cary Hall -located on <br />a pedestal outside the <br />building. <br />d. <br />has <br />Comcast will confirm <br />that the Cary Hall and <br />School Administration <br />Building connections <br />are operational <br />Need mileage of the <br />Jane Lyman <br />(Comcast) <br />Jim Akimchuk <br />V:ACommunications Advisory Committee.CAC\CAC Minutes 3-17-05.doc Page 2 of 10 <br />