Center Restrooms <br /> Plans for the Center Restrooms were shown to the PBC for the first time. These plans were of <br /> the 90% design. It was indicated that bid documents could be completed this spring. A <br /> construction timeframe had not been finalized since it had not been determined if summer <br /> programs could thrive without these facilities available. Melissa Battite Director of Recreation <br /> stated that if summer was the best period for construction, that could certainly be reviewed. <br /> DPF informed PBC that the project included turning two bathrooms into six individual restrooms <br /> with improved lighting, and ventilation. The work on the storage side would allow DPW to house <br /> lawn tractors in the building instead of on-site in sea containers. <br /> A question was asked if this project should move forward given the potential High School project <br /> in the future. DPF replied that we do not know what scope any High School project may or may <br /> not involve and that the Funding for the Center Restrooms was in the hands of Spring Town <br /> Meeting. <br /> A comment was made that the project should consider solar if it has good exposure and also <br /> consider a Pin & Sleeve so an emergency generator could easily be hooked up to the building in <br /> case of an emergency. <br /> Meeting adjourned. Next meeting to discuss VE Matrix discussed above. <br />