Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2022 ATM& STMs 2022-1 & -2 <br /> • Municipal Building Envelopes and Systems (Article 16(d): Work is nearly completed at <br /> Lexington Community Center on air sealing, facia work, and insulation to make the building <br /> more energy efficient. <br /> • School Building Envelopes and Associated Systems (Article 16(f): Facia work on Bridge and <br /> Bowman is out to bid for work to be done in the summer of 2022. <br /> • Space Needs for School Year 2021-22: Work has been completed at the Diamond Middle School <br /> for converting the computer room into a space for the Intensive Learning Program. <br /> • Public Facilities Mechanical/Electrical System (Article 16(c)): Work is ongoing for replacing Air <br /> Handling Units, Energy Recovery Units, and Variable Frequency Drives throughout the Town <br /> Office Building to enhance airflow throughout the building. This work will continue through <br /> Summer 2022. Work has also been performed at the Lexington High School to replace the <br /> domestic hot water system. Work is planned to replace the Air Handling Unit at the Clarke <br /> Middle School. <br /> • Center Recreation Complex Bathrooms & Maintenance Building Renovation (Article 10(e)): <br /> Currently, Design Development is completed, and the project is 50% of the way through the <br /> Construction Document phase. <br /> • Townwide Roofing Program (Article 16(e): Work on the Town Office Building and the CMB will <br /> begin in Spring 2022. This is a repair,not replacement. <br /> • Westview Cemetery Building. This is out for bid with bids expected to be returned on February <br /> 24. Work expected to start in Spring 2022 with completion by end of 2022. <br /> • Public Facilities Bid Documents (Article 16(a)): This has been used for quotes for the Master <br /> Plan and Center Pool hot water heater estimates. <br /> The DPF is in the process of considering a consultant's report of all the Town facilities with a 20—year <br /> perspective. This Committee has not seen the voluminous report and what budgeting it addresses,whether <br /> it be routine or extraordinary maintenance, which would impact both Operating and Capital Budgets, <br /> respectively. The current budgeting and finance planning is for all five years: FY2023 through FY2027. <br /> The preliminary DPF narratives include future forecasts that are many multiples of current levels; <br /> however, DPF is ascertaining to what degree to incorporate the recommendations from that report into its <br /> formal budgeting and finance policy going forward. Specifically, some of what might be in the outyears <br /> under a new 20-year perspective are incorporated into the current 5-Year Capital Plan. We anticipate that <br /> next year's requests will reflect many significant future increases throughout the Plan. (See the Foreword <br /> for more discussion on this.) <br /> See STM 2022-1, Article 2, on Page 41, for the current cost estimate for the construction of the new <br /> Lexington Police Station. <br /> 31 <br />