Laserfiche WebLink
— Normally prefer that the overflow outlets be installed in areas more known to the <br /> homeowner to catch any backing up of the system. <br /> Responses from the Representative: <br /> — That area of the pool deck to the easterly lot line is existing and the plan is to maintain <br /> that area. There is a shed in that area, however it will be removed. <br /> — The lot is not very large and limited in space and ground level. Could look into installing <br /> the overflow at the downspout, but might provide greater risk of damage to the home. <br /> Ms. Dohan mentioned that the plants on the planting plan appear to be clumped together and <br /> asked if they could be more scattered and mixed around each other. Ms. Samuels stated that this <br /> isn't really a problem but that the plantings could benefit in smaller groups. <br /> Ms. Mullins reminded the Commission of the retaining wall and driveway encroachment onto <br /> town-owned land. <br /> On a motion by Mr. Langseth and seconded by Ms. Samuels, the Commission voted 7-0 by roll <br /> call vote to continue the hearing to the January 10, 2022 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Duke Bitsko—Aye <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:47 PM <br /> Notice of Intent: 440 Bedford Street <br /> ViewPoint Cloud Permit# CN0I-21-37, DEP#201-1243 <br /> Applicant: Elisha Long, Trammell Crow Company <br /> Property Owner: Ashok Patel, Ayushi LLC Project: proposed life science lab building with <br /> associated parking structure within the 100-foot Buffer Zone to Bordering Vegetated Wetlands, <br /> 200-foot Riverfront Area, and Bordering Land Subject to Flooding <br /> Previous Meeting Date: 9/27/2021 <br /> Supplemental Documentation Submitted: <br /> — Site Development Plans; Prepared by: Kelly Engineering Group, Inc.; Sheet No. through <br /> Sheet No. 11; Date: 8/20/2021 and revised through 12/9/2021; <br /> — Stormwater Management Report; Prepared by: Kelly Engineering Group; Stamped by: <br /> David Noel Kelly, PE Civil No. 37942; Date: 8/20/2021 and revised on 12/9/2021; <br /> — Site Development Plan Submittal; Sheet L0.0, Sheet L1.0 and Sheet Ll.1, Prepared by: <br /> Halvorson; Date: 8/23/2021 and revised 12/13/2021; <br />