Laserfiche WebLink
The Conservation Commission received written comments and feedback from the public during <br /> an open comment period after the hearing was continued. Mr. Langseth said that, while he is not <br /> advocating for a parking lot on Brent Road, he does not like the idea that it has been taken off the <br /> table because of neighborhood comments received. Mr. Hamilton clarified that no action has <br /> been taken, and that the Brent Road parking area is not off the table. Ms. Amber Carr, <br /> Conservation Coordinator, further clarified that the original plan was reduced from 8 parking <br /> spaces to a maximum of 2 handicap spaces, and that this was based on public feedback. <br /> On a motion by Mr. Beuttell and seconded by Ms. Ladd, the Commission voted 7-0 by roll call <br /> vote to accept the Ecological Land Management Plan for Willard's Woods. <br /> Record of vote as follows: <br /> Duke Bitsko—Aye <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 8:27 PM <br /> 181 Marrett Road: Notice of Intent <br /> ViewPoint Cloud Permit# CN0I-21-42, DEP#201-1245 <br /> Applicant:/Property Owner: Glenn Herosian <br /> Project: construction of an addition to a single-family dwelling and repairs to in ground <br /> swimming pool and patio within the 100-foot buffer zone to Bordering Vegetated Wetlands and <br /> 200-foot Riverfront Area <br /> Previous Meeting Date: 11/22/2021 <br /> Supplemental Documentation Submitted: <br /> — Buffer Zone Mitigation Planting Plan; Prepared by: LEC Environmental Consultants, <br /> Inc.; Scale: F=10'; Date: 11/30/2021; <br /> — Permit Site Plan of Land; 2 Sheets; Prepared by: Patriot Engineering; Stamped and <br /> signed by: Michael J. Novak, PE Civil No. 50696; Date: 10/25/2021 and revised through <br /> 12/10/2021; <br /> — Stormwater Analysis and Calculations; Prepared by: Patriot Engineering; Stamped and <br /> signed by: Michael J. Novak, PE; Date: 10/25/2021 and revised 12/10/2021; <br /> Mr. Michael Novak, Patriot Engineering,presented to the Commission. Mr. Novak stated that <br /> the overall pool deck size was reduced to bring down the impervious cover. A planting plan was <br /> provided by LEC Environmental. A town engineering report has not been completed yet. <br /> Questions and Comments from the Commission: <br /> — What is the function of the section of pool deck that extends to the easterly lot line? <br />