|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-09-27-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2021
>
2021-09-27-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2021 11:27:58 AM
Creation date
11/1/2021 11:27:53 AM
Metadata
Fields
Template:
Archives
Department
Town Clerk
Keywords or Subject
Minutes - CONCOM - Conservation Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Record of vote as follows: <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> 7:25 PM <br /> Amendment to Order of Conditions: 609 Waltham Street <br /> ViewPoint Cloud Permit#AOOC-21-8, DEP#201-1224, CNOI-21-19 <br /> Applicant/Property Owner: Shailesh Prajapati <br /> Project: adding an overflow drain inlet on the porous pavement to avoid ponding in the barn and <br /> proposed addition; maintaining a 7.5-foot distance between the porous pavement and the barn; <br /> increasing the distance separating the barn from the infiltration system to 11.7 feet; adding a note <br /> to the revised Site Plan requiring a structural engineer visit the site to confirm suitability of the <br /> site to accommodate the system; modify the depth of excavation to minimize soil to be removed; <br /> and a reduction in the drainage system footprint <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Letter Describing Request and attachments; From: Richard A. Kirby, LEC Environmental <br /> Consultants, Inc. ("LEC'); To: Lexington Conservation Commission; Re: Request for <br /> Amended Order of Conditions; Date: 9/7/2021; <br /> Mr. Richard Kirby, LEC Environmental Consultants, and Mr. Pedro Shimizu, assistant engineer <br /> at Gala Simon Associates,presented to the Commission the proposed changes to the infiltration <br /> system. <br /> Questions and Comments from the Commission: <br /> — Can you explain what an overflow drain inlet is? <br /> Responses from the Representative: <br /> — The overflow drain inlet is installed to avoid ponding on top of the porous pavement. <br /> There will be a grate at the surface of the pavement and will pipe to the cultec system. <br /> This has been sized to handle the overflow. <br /> On a motion by Ms. Dohan and seconded by Ms. Ladd, the Commission voted 6-0 by roll call <br /> vote to close the hearing. <br /> Record of vote as follows: <br /> Kevin Beuttell —Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br />
The URL can be used to link to this page
Your browser does not support the video tag.