Laserfiche WebLink
Documents: Updated plan with planting plan 1/11/2016 <br />Mr. Mankaryous - Engineer <br />Mr. Mankaryous explained that he made the requested changes to the plan. Erosion controls are <br />now shown around the trees that are being protected and a planting plan was provided. He also <br />added that they added the markers to demarcate the wetland area. <br />Motion to close the hearing made by Mr. Beuttell and seconded by Mrs. Dohan. Vote: 5-0 in <br />favor. <br />9:16 pm <br />DEP File No. 201-1010, BL 967 <br />NOI, Rt.2/I-95 Intersection <br />Applicant/owner: Massachusetts Department of Transportation <br />Project: Swale Restoration <br />Chris Naylor- Transystems, Alex Murray MassDOT <br />Documents: O and M plan 1/4/2016, Historical drainage detail 1/4/2016 <br />The applicant explained that they provided an operation and maintenance plan for this specific <br />site. He also stated that they provided a backup plan in case they did not find a cobble stone <br />ditch. <br />Motion to close the hearing made by Mr. Beuttell and seconded by Mrs. Miller. Vote: 5-0 in <br />favor. <br />9:19pm <br />DET 16-1 <br />RDA, 1-5 Forbes Road <br />Applicant: The Sign Center <br />Owner: Wellford Corporation <br />Project: Installation of wayfinding signage <br />Jay Compton- the Sign Center <br />Documents: RDA Package 12/22/2015, Sign details 12/22/2015 <br />Mr. Compton explained that the project would involve removing six feet of material to dig two, <br />two foot deep holes to install the signs. <br />Motion to issue a negative determination with conditions made by Mr. Wolk and seconded by <br />Mr. Beuttell. Vote: 5-0 in favor. <br />9:22pm <br /> <br />