Laserfiche WebLink
Matt Thenen- Architect <br />Documents: RDA Package 12/22/2015 <br />Mr. Thenen explained that there would be no footprint change or impervious additions. There <br />would be no foundation changes. <br />Comments and questions from the commission: <br />Ms. Mullins questioned the porch construction that was mentioned in the building permit, but not <br />in the conservation application. Mr. Thenen answered that they have to replace the foundation of <br />the deck as part of the renovation, but those plans were included in the building permit. <br />The commission questioned where the air condensers would go for the HVAC system. Mr. <br />Thenen stated that they were going in the back of the house and he was not aware that this was in <br />the jurisdiction of the commission. <br />Motion to issue a negative determination with conditions made by Mr. Wolk and seconded by <br />Mrs. Dohan. Vote 5-0 in favor. <br />9:37pm <br />DET 16-5 <br />RDA, 121 Hartwell Ave <br />Owner: Chicago Design Network <br />Applicant: Allen and Major Associates <br />Project: Partial Demolition and proposed exterior improvements of existing building <br />Carlton Quinn- Engineer <br />Documents: RDA package 12/22/2015, Engineering report 1/7/2016, Plans 12/22/2015 <br />Mr. Quinn explained that the majority of the project is outside of the 100ft buffer zone, <br />specifically the partial demolition of the two story building. He explained that they also wish to <br />add a vestibule and do some cosmetic improvements. The proposed improvements would <br />involve a new side walk, patching of the parking lot, a new exit, new sign lighting, invasive <br />species removal, some new stairs, and a new exit. <br />Questions and comments from the commission: <br />The commission asked if they are planning on adding new parking spaces. Mr. Quinn stated that <br />they are not adding new spots, they are just restriping the parking lot and moving the <br />handicapped spaces. <br />The commission asked what will be going in place of the demolished building. Mr. Quinn <br />explained that they are planning to remove the whole foundation and loam and seed the area. <br />Trees will be added. <br /> <br />