Laserfiche WebLink
Town of Lexington Permanent Building Committee <br /> p05 MpgN <br /> Op 1775 �c <br /> Permanent Members: Co-Chairman:Jon Himmel &Co-Chairman Dick Perry, Philip Coleman, a <br /> Charles Favazzo, Carl Oldenburg, Peter Johnson, Celis Brisbin <br /> APMIT' <br /> �fkINGtO� <br /> PBC Minutes 4-22-21-Meeting Held Via Zoom 5PM <br /> Members present:Jon Himmel, Dick Perry. Carl Oldenburg, Chuck Favazzo, Phil Coleman, Celis Brizben, Peter <br /> Johnson <br /> Staff members present: Mike Cronin, Mark Barrett <br /> TBA Architects:Justin Humphries <br /> Westview Cemetery Building project update <br /> Justin Humphreys from TBA architects was present to provide an update on the status of the project and review <br /> the final estimates and Alternates for bidding of the project. <br /> The building floor plan and elevations were quickly reviewed to refresh everyone's memory on the project. <br /> The overall project budget was reviewed showing a total appropriation of$3,560,000and outlining approximately <br /> $490,000 in project soft costs, $270,000 for construction contingency and leaving approx. $2,800,000 for <br /> Construction costs. <br /> The Estimating History was then reviewed with TBA's Estimator who had provided an initial Construction <br /> Documents [CD] estimate on 3/4/21 at$4,500,000. <br /> Due to some inconsistencies, in TBA's estimator's first CD estimate,the town engaged an independent estimator <br /> who provided his initial CD estimate on 3/9/21 at$3,116,000. <br /> TBA's estimator and the Town's estimator reconciled their estimates. TBA's estimator prepared two subsequent <br /> updates,with the final at$3,308,000. The town's estimator prepared a subsequent update on 3/11/21 at <br /> $3,106,000. <br /> DPF,the PBC and TBAS discussed Value Engineering options to bring the project back into line with the budget <br /> approved by Town Meeting. Additive Alternates were also discussed. <br /> A lengthy Value Engineering discussion ensued. <br /> A. Value engineering items included items to be removed from the project entirely: <br /> • Changing the current metal siding system to an alternate metal panel that would save costs. <br /> • Removing the gravel parking area,which could be added at a later time <br /> • Removing the 2 ft wide plaster soffit through the administrative area <br /> • Removing the air curtain and the front entry(empty conduit path to remain part of the base bid) <br /> • Changing Bathroom floors from tile to Sheet vinyl <br /> • Changing Bathroom walls from full tile to 4 ft. <br /> And <br /> B. Items that were to be reduced in scope in the base bid and added back in as Additive Alternates <br /> depending upon the actual bids. These items included (in no particular order) the following: <br /> • Remove thin Brick from Base bid at long interior wall at admin area and make it an alternate <br /> • Remove parapet at roof and make an alternate <br /> • Remove landscaping and Loam and seed from new building Base Bid and make alternate <br /> 201 BEDFORD STREET• LEXINGTON, MASSACHUSETTS 02420 <br />