Laserfiche WebLink
Comments from the Commission: <br /> — Is the proposal to take off the current pavement or just add another layer? <br /> Responses from the Representative: <br /> — Whether or not to take off the current pavement or add another layer is to be determined; <br /> however, if removal the excess material would be taken off site immediately. <br /> Ms. Buczynski asked if erosion control should be installed and a limit of work line, or if the <br /> proposal includes enough maintenance that it would not be necessary. Mr. Langseth responded <br /> that if there is no stockpiling of materials then no erosion control would be necessary. <br /> On a motion by Mr. Langseth and seconded by Mr. Beuttell, the Commission voted 6-0 by roll <br /> call vote to close the hearing. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Phil Hamilton—Aye <br /> Holly Samuels —Aye <br /> 8:07 PM <br /> Notice of Intent—8 Paddock Lane <br /> ViewPoint Cloud Permit# CN0I-21-29, DEP#201-#### <br /> Applicant/Property Owner: Sabrina and Raffi Afeyan <br /> Project: proposed front and rear additions, and the addition of a patio, deck, walkway and stairs <br /> to a single-family dwelling located within the 100-foot buffer zone to Bordering Vegetated <br /> Wetlands <br /> Documentation Submitted: <br /> — "Plans for Residential Single Family Addition and Patio"; "Existing Conditions" Sheet 1 <br /> of l; "Site Plan and Demolition" C-102; "Grading, Drainage and Erosion Control Plan" <br /> C-103; "Details" C-501; Prepared by: Allen & Major Associates, Inc.; Stamped and <br /> signed by: Carlton M. Quinn, PE Civil No. 49923; Date: 6/15/2021; <br /> — Notice of Intent application and attachments; Prepared by: Allen & Major Associates, <br /> Inc.; Prepared for the Applicant: Sabrina List Afeyan and Raffi Afeyan; Date: 6/15/2021; <br /> — Drainage Report; Prepared by: Allen & Major Associates, Inc.; Prepared for the <br /> Applicant: Sabrina List Afeyan and Raffi Afeyan; Date: 6/15/2021; <br /> — "Existing Conditions Plan"; Prepared by: O'Driscoll Land Surveying, Inc.; Stamped and <br /> signed by: Daniel A. O'Driscoll, PLS No. 39050; Date: 4/22/2021; <br /> Mr. Steven Lee, Project Engineer, presented before the Commission. The Applicant is proposing <br /> to install a raingarden and connect all existing and proposed roof runoff to the raingarden. The <br />