Laserfiche WebLink
— No,that catch basin is not located on this property and is outside of the 100-foot buffer <br /> zone. <br /> — Yes, we can keep the path outside of the 25-foot buffer zone. <br /> — If Blazing Star is available we will consider using it, however we have struggled to get it <br /> from a nursery standpoint. <br /> A Condition will be added that the path is to be rerouted outside of the 25-foot buffer zone to the <br /> extent possible. <br /> On a motion by Ms. Samuels and seconded by Ms. Dohan, the Commission voted 6-0 by roll call <br /> vote to issue a Negative Determination with Conditions. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Phil Hamilton—Aye <br /> Holly Samuels —Aye <br /> 7:55 PM <br /> Amendment to the Order of Conditions —453 Concord Avenue (The Cotting School) <br /> ViewPoint Cloud Permit#AOOC-21-5, DEP#201-1155, BL#1111 <br /> Applicant/Property Owner: The Cotting School <br /> Project: Repaving of existing walkways along the backside of the school within the 100-foot <br /> buffer zone to Bordering Vegetated Wetlands <br /> Documentation Submitted.- <br /> - <br /> ubmitted:— Memorandum; From: Meg Buczynski, Activitas; To: Lexington Conservation <br /> Commission; Subject: NOI Amendment—Walkway Repaving; Date: 6/14/2021; <br /> — "Layout and Materials Plan"; Sheet L-1.1.1; Prepared for: The Cotting School, Athletic <br /> Addition; Prepared by: Activitas; Stamped and signed by: Megan E. Buczynski, PE Civil <br /> No. 47392; Date: 6/14/2021; <br /> — Memorandum and attachments; From: Meg Buczynski, Activitas; To: Lexington <br /> Conservation Commission; Subject: NOI Amendment Drainage Calculations; Date: <br /> 6/14/2021; <br /> Ms. Megan Buczynski, Principal Civil Engineer from Activitas, presented on behalf of the <br /> Applicant and Property Owner, The Cotting School. Ms. Buczynski stated that there is a slight <br /> increase in the rate of the 2 year storm event peak runoff rate, however an overall reduction in <br /> the overall volume for the 2 year storm event. The Cotting School does not plan to treat the <br /> walkways. Towards the northern side of the site, where there is a steeper slope, the stormwater <br /> will continue to runoff down the slope and on the eastern side it will continue to run along the <br /> grass towards the wetlands. <br />