|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2021-05-24-CONCOM-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Conservation Commission-ConCom
>
Minutes
>
2021
>
2021-05-24-CONCOM-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2021 9:35:40 AM
Creation date
6/24/2021 9:35:33 AM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> Duke Bitsko —Aye <br /> 8:22 PM <br /> ViewPoint Cloud Permit# CN0I-21-19, DEP#201-1224 <br /> Notice of Intent: 609 Waltham Street <br /> Applicant/Property Owner: Shailesh Prajapati <br /> Project: construct a living space addition to an existing single-family dwelling and install a <br /> porous pavement driveway extending from Waltham Street to a detached barn. Portions of the <br /> proposed activities are located within the 100-foot Buffer Zone to BVW <br /> Documentation Submitted: <br /> — Notice of Intent Application and Wetland Resource Area Analysis and attachments; <br /> Prepared by: LEC Environmental; Prepared for Applicants/Property Owners: Shailesh <br /> Prajapati and Vaishy Patel; Date: 5/6/2021; <br /> — Buffer Zone Mitigation Planting Plan, dated May 5, 2021 prepared by LEC <br /> — Drainage Plan—609 Waltham Street in Lexington, Massachusetts dated May 3, 2021, <br /> prepared by Gala Simon Associates, Inc. <br /> — Engineering Drainage Calculations for 609 Waltham Street, Lexington, Massachusetts <br /> dated May 3, 2021 and prepared by Gala Simon Associates, Inc. <br /> Mr. Richard Kirby, LEC Environmental, presented before the Commission. Mr. Kirby stated that <br /> he is going to speak with Mr. Al Gala, Project Engineer, about reshaping the driveway or <br /> perhaps installing a retaining wall. Also, Mr. Kirby is going to discuss the proximity of the <br /> infiltration system to the foundation with Mr. Gala. Information will be added to the record on <br /> how the steep slope next to the barn will be stabilized, as well as adding information on the <br /> invasive species within the edge of the wetland boundary to the planting plan. <br /> On a motion by Ms. Samuels and seconded by Mr. Beuttell, the Commission voted 7-0 by roll <br /> call vote to continue the hearing to the June 7, 2021 meeting at the applicant's request. <br /> Record of vote as follows: <br /> Kevin Beuttell—Aye <br /> Alex Dohan—Aye <br /> Ruth Ladd—Aye <br /> David Langseth—Aye <br /> Holly Samuels —Aye <br /> Phil Hamilton—Aye <br /> Duke Bitsko —Aye <br />
The URL can be used to link to this page
Your browser does not support the video tag.