Laserfiche WebLink
"[Some of the] preliminary conclusions based on our initial evaluation of locating a source separated <br /> organic waste processing facility at the Hartwell Avenue Landfill Site:" <br /> "• The Hartwell Avenue Landfill Site offers several advantages which make it an ideal candidate for a <br /> source separated organic waste processing facility including a compatible existing use, sufficient land <br /> area, adequate transportation access, good separation from residential property, nearby access to water <br /> and sewer utilities, and nearby access to the utility grid and natural gas transmission line for exporting <br /> electricity or pipeline quality gas;" <br /> "• To be cost effective, the facility will need to accept approximately 40,000-50,000 tpy [tons per year] <br /> of food waste plus another 44,000 to 55,000 tpy of yard waste based on preliminary input from two <br /> potential vendors. This compares with approximately 10,000 tpy of yard waste that is presently handled at <br /> the Hartwell Avenue Landfill site;" <br /> "•Approximately 10 to 12 acres of land would be needed to support a 40,000 to 50,000 tpy anaerobic <br /> digestion facility and a 55,000 to 65,000 tpy covered aerated static pile composting operation which is <br /> approximately the same area currently used to windrow compost 10,000 tpy of yard waste. The areas of <br /> the Landfill Site that are currently used for yard waste composting operations, also appear to be the most <br /> practical places to locate the new operations;" <br /> "• Due to the uniqueness of this project, there is some uncertainty to the process and time frame for <br /> securing local and state permit approval. The Town is participating in a Task Force committee established <br /> by MassDEP and other state agencies to review and potentially streamline the permitting process;" <br /> "•While anaerobic digestion of food waste is well demonstrated in Europe and anaerobic digestion of <br /> sewage sludge is common in the U.S., this would be a first of its kind project in Massachusetts which <br /> presents some project risk;" <br /> "• This type of project offers the Town an opportunity to advance its stated goal of encouraging the <br /> development of renewable energy while maximizing the potential revenues from the Hartwell Avenue <br /> Landfill Site. Current net revenues from composting operations at this site amount to approximately <br /> $90,000 per year;" <br /> "• The term of any lease would likely need to be 15 years or more to allow the vendor to recover its <br /> capital cost to develop and construct the facility." <br /> "[Some of the]Recommendations" <br /> "• The permitting process with MassDEP needs to be finalized. Specifically, clarification is needed as <br /> whether (i) source separated organics are to be considered a recyclable material for purposes of the <br /> regulations, (ii) the existing site assignment for the Hartwell Avenue Landfill can be used for the new <br /> facility and (ii[i]) an Environmental Impact Report (EIR) needs to be filed for the project under the <br /> Massachusetts Environmental Policy Act. MassDEP is currently reviewing the regulatory framework for <br /> this type of facility and these requirements will have to be worked out prior to the issuance of an <br /> RFP/RFQ." <br /> "• The proposed facility can be constructed within the limitations of the landfill closure under the <br /> Massachusetts Contingency Plan (MCP, 310 CMR 40.0000). Modifications to the existing documents <br /> including the Activity and Use Limitation (AUL) would be required to accommodate the new facilities <br /> but these changes are within the limitations of the current site closure documents. These modifications are <br /> best obtained by the selected project developer with oversight by the Town's Licensed Site Professional <br /> (LSP)." <br /> "• The Town should solicit formal proposals from qualified vendors through a combined Request for <br /> Qualifications/Request for Proposal (RFQ/RFP) process. This document should include specific <br /> information on the site and the required permit approvals as well as detailed minimum qualifications on <br /> the proposed technology and the financial viability of the proposer. The RFQ/RFP should also include a <br /> draft land lease agreement that contain specific requirements and conditions that the Town desires." <br /> Page 2 of 2 <br />