|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2011-ATM-ART7-CEC-rpt (informational handout)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2011
>
Reports
>
2011-ATM-ART7-CEC-rpt (informational handout)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 1:59:10 PM
Creation date
5/6/2015 12:01:38 PM
Metadata
Fields
Template:
Archives
Year
2011
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Lexington Capital Expenditures Committee (CEC)—Information Handout April 5, 2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"[Some of the] preliminary conclusions based on our initial evaluation of locating a source separated <br /> organic waste processing facility at the Hartwell Avenue Landfill Site:" <br /> "• The Hartwell Avenue Landfill Site offers several advantages which make it an ideal candidate for a <br /> source separated organic waste processing facility including a compatible existing use, sufficient land <br /> area, adequate transportation access, good separation from residential property, nearby access to water <br /> and sewer utilities, and nearby access to the utility grid and natural gas transmission line for exporting <br /> electricity or pipeline quality gas;" <br /> "• To be cost effective, the facility will need to accept approximately 40,000-50,000 tpy [tons per year] <br /> of food waste plus another 44,000 to 55,000 tpy of yard waste based on preliminary input from two <br /> potential vendors. This compares with approximately 10,000 tpy of yard waste that is presently handled at <br /> the Hartwell Avenue Landfill site;" <br /> "•Approximately 10 to 12 acres of land would be needed to support a 40,000 to 50,000 tpy anaerobic <br /> digestion facility and a 55,000 to 65,000 tpy covered aerated static pile composting operation which is <br /> approximately the same area currently used to windrow compost 10,000 tpy of yard waste. The areas of <br /> the Landfill Site that are currently used for yard waste composting operations, also appear to be the most <br /> practical places to locate the new operations;" <br /> "• Due to the uniqueness of this project, there is some uncertainty to the process and time frame for <br /> securing local and state permit approval. The Town is participating in a Task Force committee established <br /> by MassDEP and other state agencies to review and potentially streamline the permitting process;" <br /> "•While anaerobic digestion of food waste is well demonstrated in Europe and anaerobic digestion of <br /> sewage sludge is common in the U.S., this would be a first of its kind project in Massachusetts which <br /> presents some project risk;" <br /> "• This type of project offers the Town an opportunity to advance its stated goal of encouraging the <br /> development of renewable energy while maximizing the potential revenues from the Hartwell Avenue <br /> Landfill Site. Current net revenues from composting operations at this site amount to approximately <br /> $90,000 per year;" <br /> "• The term of any lease would likely need to be 15 years or more to allow the vendor to recover its <br /> capital cost to develop and construct the facility." <br /> "[Some of the]Recommendations" <br /> "• The permitting process with MassDEP needs to be finalized. Specifically, clarification is needed as <br /> whether (i) source separated organics are to be considered a recyclable material for purposes of the <br /> regulations, (ii) the existing site assignment for the Hartwell Avenue Landfill can be used for the new <br /> facility and (ii[i]) an Environmental Impact Report (EIR) needs to be filed for the project under the <br /> Massachusetts Environmental Policy Act. MassDEP is currently reviewing the regulatory framework for <br /> this type of facility and these requirements will have to be worked out prior to the issuance of an <br /> RFP/RFQ." <br /> "• The proposed facility can be constructed within the limitations of the landfill closure under the <br /> Massachusetts Contingency Plan (MCP, 310 CMR 40.0000). Modifications to the existing documents <br /> including the Activity and Use Limitation (AUL) would be required to accommodate the new facilities <br /> but these changes are within the limitations of the current site closure documents. These modifications are <br /> best obtained by the selected project developer with oversight by the Town's Licensed Site Professional <br /> (LSP)." <br /> "• The Town should solicit formal proposals from qualified vendors through a combined Request for <br /> Qualifications/Request for Proposal (RFQ/RFP) process. This document should include specific <br /> information on the site and the required permit approvals as well as detailed minimum qualifications on <br /> the proposed technology and the financial viability of the proposer. The RFQ/RFP should also include a <br /> draft land lease agreement that contain specific requirements and conditions that the Town desires." <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.