|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-11-04-STM-CEC-rpt
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
ELECTIONS AND TOWN MEETING ACTION & WARRANTS
>
Town Meeting Minutes and Reports
>
2010-2019
>
2013
>
Reports
>
2013-11-04-STM-CEC-rpt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2022 4:17:19 PM
Creation date
5/6/2015 11:59:42 AM
Metadata
Fields
Template:
Archives
Year
2013
Author or Source
Capital Expenditures Committee
Department
Town Clerk
Keywords or Subject
Town Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lein • ton Communit Center Phase 1 <br /> 0911 31 l b <br /> , <br /> Interim Scope 'Rate 1 til <br /> Hard Costs w d <br /> Oi rOCk CoSk# 5510,0 Inkeriln $510,000 <br /> Structure! ;722,000 n <br /> Lavatories 551.000 C7 ( <br /> pp.o Rerinemenis 177,000 <br /> AN Systems $53.O00 <br /> Signage 174,0O0 S <br /> Fl. ' <br /> Ce1I1Fig C" <br /> 1167.COO � to <br /> Painting 152,000 (l <br /> blew Lighting 159,0100 : Z <br /> Direct eml Su Masi $Si0,04D' $1,70,000 q <br /> I <br /> Direct Cost Markups and contingencies c <br /> 0 <br /> General Conditions. General Requ.ramante, Insurance&Fee 24% $122,E 13.20% $aO9.000O <br /> Pnce end Design Contingency 15% 395.000 15% 5326,00D r, 4 <br /> Escalation Contingency 4.60% $29,000 0% 10 4 <br /> Total Estlrnaled Construction Coat for Phase 1 $756,000 12.&40.000 wPhy <br /> rurme <br /> Canafiatian C Ma nye Order C anlin�a }r Mize 4 15% 51 i 3,00D 7.5% 5187,000 am <br /> � <br /> ti� cro <br /> AONO Kolrc <br /> 1 1 Conitrucn Gurriarl■ 0,60% 6-110,000 O M 1102,000 ° <br /> SE O <br /> A&E Biddirt0& Cbr161l1or«Admlrwletritlorl 2.00% $18.000 2.5 0 ( y <br /> FF&E 10 175400 o -i <br /> �,+tl <br /> Misc.Comenle{ L 1. <br /> us nf S mom 1101000 N <br /> Co rrenisoloOng 515 010 116,000 o <br /> Total EitImatre Soft Coal for Phan I 1 ,000 � '' <br /> I o' v' <br /> Hard Cast 4$eft Coal 5962,41010 $3.011,01:10 <br /> 4 <br /> Project ContIn0encv 3.00% 1881000 ° <br /> S 400 C3-00,000- g, o <br /> 41, <br /> Other Consideration; CD <br /> Sidewalk.Design $20,000 ' <br /> Prime 2 Schematic ConlInkkation $60.1300 <br /> Tota I Project Cost s ,t s.g,000 <br /> 1011712013 : 11:52 AM As Approved by AhCCAC <br />
The URL can be used to link to this page
Your browser does not support the video tag.