Laserfiche WebLink
Donham & Sweeney <br />Brett 'Bonham, Principal,: E. <br />y D. Shaw, Principal, ALA, LEED AP <br />C. Christopher Loan, associate; A7:1 <br />Lexington Police & Fire Station Study <br />Meeting Notes <br />8 June 2010 <br />Page 1 of 2 <br />Attending: Jonathan Himmel <br />Eric Brown <br />Peter Johnson <br />Carl Oldenburg <br />Richard Perry <br />Chief William Middlemiss <br />Chief Mark Corr <br />Patrick Goddard <br />Mark Barrett <br />Brett Donham <br />Jeff Shaw <br />Distribution: All present, plus <br />Nick Derr <br />Avi Shoss <br />File: 0907:2.2 <br />Next Meeting: 6/8/2010 <br />A R C H I T E C T S <br />Chair, Permanent Building Committee <br />Permanent Building Committee <br />Permanent Building Committee <br />Permanent Building Committee <br />Permanent Building Committee <br />Fire Chief, Lexington Fire Department <br />Police Chief, Lexington Police Department <br />Director, Department of Public Facilities <br />Project Manager, Department of Public Facilities <br />D &S <br />D &S <br />D &S <br />D &S <br />• B. Donham described the results of the structural engineering study for both buildings, a copy <br />of which has been given to M. Barrett. Both buildings are in non - compliance with the seismic <br />requirements of the new Building Code. Retrofitting both buildings with seismic resistant <br />structures is very expensive. To avoid that cost, any addition must have a 3" wide soft joint <br />with the original building and new openings in the masonry walls must be very limited in <br />size. The structural slab in the apparatus room is failing, has sagged and has cracks that <br />extend through the slab. The structural engineer believes it will continue to function at least to <br />mid -2011 and perhaps beyond, but is unwilling to predict when it will fail to the extent of <br />putting the apparatus at risk. He said "something needs to be done soon ". <br />• J. Shaw presented two sets of plans for the Fire Station. One is a renovation/addition and the <br />other is a new building. These plans resulted from 2 meetings with the Fire Chief. J. Shaw <br />described the constraints offered by the existing building and the increase in floor area <br />resulting from trying to reuse the building. He also described the significant traffic difficulties <br />with all apparatus trying to exit or enter via Camilla Avenue onto Bedford Street. The <br />Permanent Building Committee offered the following comments; <br />o In the parking table, indicate the number of existing spaces as was done with the <br />Police Station <br />o In the new building design try to avoid the small setbacks at the second floor because <br />of the extra cost <br />o In the new building try to put the stairs in -board so exterior walls are freed up for <br />windows <br />Bosion MA 021 1 1 <br />617 4 2 3 1.100 <br />donharnands;c-eeney.com <br />4 Head fide Church Rd. <br />Post Office Box 265 <br />.A. Ina ME. •1453 <br />2 0 7 586 60;0 <br />