|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-06-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010-2019
>
2010
>
2010-06-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:35 PM
Creation date
4/17/2015 1:20:01 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• B. Donham presented one set of plans for the Police Station. These plans grew out of <br />extensive consideration by Police Department staff and 2 meetings with them. A copy of the <br />Sixth draft of the Space Needs Program was distributed. The program area has grown from <br />24,450 SF on 4/13/10 to 28,126 SF in the Sixth Edition. Increases were primarily in the <br />Garage, the Sally -port, the Lobby, and the Lockers [as a result of moving from 30" to <br />36" lockers and increasing the number of lockers]. The Police Chief said the Dispatch needs <br />to be larger, and secure space, preferably indoors, needs to be provided for 2 emergency <br />generators. He also said he needs a serviceable range that is large enough to train on; the <br />present one is too short and an outdoor range, reproducing real -world conditions, is preferred. <br />The present range is contaminated with lead, he said. The Committee instructed D &S to <br />construct the base building pricing with refurbishment of the present range in the building <br />plus a new indoor /outdoor rang at Hartwell Avenue. An alternate should include a new indoor <br />range at the Police Station. <br />• Other comments from the Permanent Building Committee; <br />o Document the gross to net area for each building <br />o Provide cost estimates and elevations at the next meeting on 7/13. The estimates are <br />to include plans with and without seismic upgrades as well as the costs to extend the <br />useful life of both buildings by 10 years. MEP narratives will be needed as well <br />o The 7/13 meeting will include members of the HDC on an informal basis <br />o There will be a special meeting on 7/27 that includes the Capital Expenses <br />Committee and possibly a representative of the Boar of Selectmen <br />
The URL can be used to link to this page
Your browser does not support the video tag.