|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-12-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2000-2009
>
2009
>
2009-12-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:13:22 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />08 December 2009 Meeting <br />4.3Progresspresentation <br />7/14/09 <br />PresentationbyArchitect,MendersTorreySpencerforStoneBuildingHistoricStructuresReportStudyworkatnextmeeting8/11/09 <br />at7PM. <br />8/11/09 <br />LynneSpencerandPatrickGuthriemadeapresentationoftheirworkanddiscoveriesrelativetotheHistoricStructuresreportand <br />StudyprojectfortheStoneBuilding.Thepresentationwasinapowerpointformatandisplannedtobemadeavailablethroughthe <br />Librarywebsite.Thereporttodateincludeshistoricalinformationandfindingsonthebuilding,interpretivedrawingsofhowthe <br />originaladditionlikelylooked,relativetomassing,fenestrations,andlayout.Topicstouchedonincludedpotentialoccupancylevels <br />ofthelyceumroomonthesecondfloor.Somemembersoftheaudience/townfeltthatahigheroccupancyofthelyceumshouldnot <br />beruledoutbasedsolelyoncoststoimprovestructureandthatoptionsshouldbemadeknown. <br />ThefinalreportisdueattheendofSeptember.ThearchitectswilltransmittotheDPFatthe8/20/09meetingascopeofworkfor <br />interimorͻĬǒƷƷƚƓǒƦͼrepairsthatshouldbecompletedpriortowinter2009andareexpectedtocostlessthan$10,000.00. <br />ThearchitectshavemeetwiththeHeritageCenterCommitteetodiscussprogrammaticneedsforthebuildingandsomeconcept <br />testdrawingswillbedevelopedshowinghowbesttheseprogrammaticneedsmayfitwithintheexistingbuildingandźƷƭhistorical <br />fabricandcharacter. <br />EstimateswillbeincludedinthefinalreportforͻƷƚƷğƌƦƩƚƆĻĭƷͼincludinganyaddition. <br />Theestimatesshouldreflectthatanyconstructionactivitymaynotoccuruntil2011. <br />111009 <br />MotiontosupporttheEnvelopeStabilizationProjectidentifiedintheMTSReportfortheStoneBuildingintheamountof <br />$201,000.00 <br />Motion:JonHimmelSecond:CarlOldenburgVote:Unanimous <br />5.0FireandPoliceStudyandDesign <br />5.1DesignerSelection <br />12/8/09 <br />DPFwaswaitingforanyreferencecheckstocomeinfromthePoliceChiefpriortomovingforwardwithnotifyingtheArchitects <br />onranking,HavingreceivedsaidnoticethisdayandhavingreceivedFirechiefreferencespreviously,,DPFshallnotifyarchitects <br />ofrankingtotheTownManagerandintentiontonegotiate. <br />DPFtorequestscopeofworkaswritteninDonham&Sweeneyproposal. <br />EricBrowntoassistwithscopedevelopmentandJonHimmeltoassistwithContractdevelopment. <br />NextMeeting: <br />1/12/09 <br />PublicServicesBuilding,201BedfordSt.7:00PM <br />MeetingAdjourned8:30PM <br />MotiontoAdjourn <br />Motion:PeterJohnson2nd:DickPerryVoted:Unanimous <br />Page 9 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.