|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-09-08-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2003 - 2009
>
2009
>
2009-09-08-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:10:58 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PBC Meeting Minutes <br />11 September 2009 Meeting <br />1.3 Meeting Minute Format <br />(Item Relocated from 2.24 to general business) <br />For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />8/11/09 <br />PBC Chair reports that after discussions with the Town Manager, the purchase of Prolog Software was approved for <br />purchase for use by DPF in developing future meeting minutes. PBC indicated that some level of training would be <br />required for use of the software. <br />9/8/09 <br />DPF to inquire about status of software purchase. Proposal should include training. <br />2.0 PUBLIC WORKS & FACILITIES BUILDING PROJECT <br />2.01 Contractor Monthly Requisition <br />For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />8/11/09 <br />Application for Payment # 22 to the General Contractor was reviewed. <br />Discussion surrounded the payment line item for pavement at $32,000.00. Based upon percentage of work complete <br />and outstanding issues with non-acceptance of current top coat, the PBC approved payment of the requisition less the <br />amount due on 02300 pavement $32,000.00. <br />Motion: To approve Application for Payment #22, less the $32,000 pavement allowance. <br />Motion: Dick Perry 2nd: Eric Brown Vote: Unanimous <br />9/8/09 <br />Postpone until the requisition is finalized. <br />2.02 Diverted Construction Waste <br />For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />3/10/09 <br />The diverted Construction waste is reported at 86%. <br />9/8/09 <br />Mark Barrett to verify if a report is required after issue of Certificate of Occupancy. <br />2.03 Construction Change Orders <br />For the purposes of reducing ongoing printed text previous entries under this heading may have been removed from <br />current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/8/09 <br />Change Order 19 <br />Motion to approve $147,772.76 $147,772.76 <br />Motion: Bill Kennedy Second: Peter Johnson Vote Unanimous <br />Change Order 20 <br />Motion to approve $136,572.50 $136,572.50 <br />Motion: Dick Perry Second: Peter Johnson Vote Unanimous <br />Page 2 of 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.