Laserfiche WebLink
PBC Meeting Minutes <br />14 July 2009 Meeting <br />6/24/09 <br />Language for time extension change order was finalized with PBC consent. PBC Approved Time <br />Extension request through approval of Change Order 17 in the amount of 71 days and $86,539.00, <br />see item 2.03 above. <br />2.29 Equipment <br />5/19/09 <br />The proposed Equipment list was discussed with a corresponding estimate of $445,000.00 against <br />a budget of $550,000.00. The equipment was predominately items included in the original plans <br />i.e. shelving and industrial equipment that was removed for budgetary reasons and is now being <br />reinstated. PBC was advised that bids were being received for the equipment and in turn advised <br />DPF to remain within the established budget. <br />Concrete Truck Stops proposed for Vehicle Staging and Prep Area $6,000.00 <br />Motion to approve $6,000 for Concrete Truck Stops <br />Motion Eric Brown Second: Carl Oldenburg Vote Unanimous <br />Padlocks for Lockers Requested for Locker room $ 600.00 <br />Motion to approve $600 for Padlocks <br />Motion Eric Brown Second: Carl Oldenburg Vote Unanimous <br />6-24-09 <br />Bids for Equipment <br />Requisitions #1-#5 and CTA Change Order proposal 127 $202,931.35 <br />Motion to approve $202,931.00 for Equipment Bids <br />Motion: Dick Perry Second: Eric Brown Vote: Unanimous <br />Salt Brine Not to exceed <br /> $80,000.00 <br />Motion to approve not to exceed $80,000.00. <br />Motion: Peter Johnson Second: Jon Himmel Vote: Unanimous <br />Start Up supplies Car Wash $1,649.45 <br />Motion to approve $1,649.75 for start up car wash supplies <br />Motion: Eric Brown Second: Peter Johnson Vote Unanimous <br />7/14/09 <br />DPF reported that two pieces of equipment remain for purchase and have budget allocations. <br />2.30 High Density File Storage Unit <br />6-24-09 <br />High Density File Storage $44,887.75 <br />Motion to approve $44,887.75 for High Density Storage <br />Motion: Peter Johnson Second: Eric Brown Vote Unanimous <br />2.31 Bi-Directional Radio <br />5/19/09 <br />The operation and need for a Bi-directional radio system in the building was discussed with the Fire <br />Department. The system boosts the signal of the fire department radios allowing them to communicate in <br />the building and improves fire fighter safety. Expected costs range from $30,000 to $50,000. <br />PBC expressed need for an Additional services fee from HKT Architects to develop an RFP for the antenna <br />system to obtain design/build quotes for same. <br />Page 7 of 15 <br /> <br />