|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2009-05-19-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2003 - 2009
>
2009
>
2009-05-19-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:47 PM
Creation date
4/17/2015 1:06:53 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 June 2009 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: 146 Maple St. Conference Room <br />Date & Time: 19 May 2009, 7:00PM <br /> <br />4/14/09 <br />Delivery of Furniture 5/7/09 assembly and installation should take approximately 1 week. <br />5/19/09 <br />Furniture installed. Some minor changes may occur. Few issues with wood furniture in one office. HKT to <br />work with WB Mason and Allsteel to resolve. <br />2.20 Exterior Finishes <br />For the purposes of reducing ongoing printed text, previous entries under this heading may have been <br />removed from current meeting minutes. Please refer to previous editions of the minutes for older insertions. <br />9/9/08 <br />The colors that were decided at an August 25th site visit were as follows: <br />a. Sand and Salt Shed siding 3040 Cottonwood <br />b. Sand and Salt Roof - FABRAL color selected: Light Gray #589 <br />c. Solid Surface - Avonite Surfaces, Studio Collection, White Sands K1-6636 <br />d. Color for the canopy channel to be sent to Eric and Carl for further consideration intent to be blue (HKT <br />to send) Final painted channel to be painted front and top and bottom at a minimum <br /> <br />f. Blue color sample for canopy was sent out for sample requested for site. <br />10/14/08 <br />HKT has received blue color samples for canopies. PBC would like to view on site with natural light. <br />11/04/08 <br />PBC would like to view canopies on site with natural light in the spring. <br />3/10/09 <br />HKT / DPF will email members of the PBC to determine a possible day to review the canopy color samples <br />at the project site <br />4/14/09 <br />The selected blue color was painted onto the steel channel band for review. <br />2.21 Town Network Head End <br />9/9/08 <br />Town looking to bring in Network head end to DPW building, meeting scheduled on site for Thursday 9/18/08 <br />@ 1:00 PM to review. <br />10/14/08 <br />Town Head End Room being revaluated and may be relocated to accommodate needs of HVAC system <br />Head End for building, and computer access for facilities maintenance staff. <br />11/04/08 <br />Contract amendment for additional cost to HKT $12,580.00 for additional HVAC equipment design for Facility <br />Room, plan changes, does not include construction. <br />Motion: To approve the Contract Amendment to HKT Architects Contract for additional HVAC <br />equipment design for Facility Room, plan changes, does not include construction. <br />Motion: Bill Kennedy 2nd: Carl Oldenburg Voted: Unanimous <br />Page 5 of 12 5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.