Laserfiche WebLink
17 September 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />09 September 2008 <br />Date & Time: , 7:00PM <br />2.9. Furniture HKT <br />5/13/08 <br />HKTÔs Furniture Proposal was reviewed and approved. <br />The PBC accepts HKTÔs fee proposal, with HKT agreeing not to charge additional funds to redesign if <br />the furnishings were to go over the budget line item. Eric, Carl all approved. <br />6/10/08 <br />Discussions on furniture selection in relation to interior finishes and color selections. HKT to meet <br />with users to confirm and fine-tune already established needs. Then HKT and user heads will meet <br />with vendors from state bid list. HKT expects this process to begin within a month. PBC concerned <br />about selecting interior finishes without knowing furniture color and fabric options. HKT stated that <br />the interior finishes / color palette could be selected and still have options on furniture colors. <br />Process needs to be fulfilled on selecting vendor in order to comply with state vendor contract. HKT <br />was sure that any of the selected vendors could meet the selected finishes / color palette. <br />7/8/08 <br />Janet from HKT provided update Ï Four vendors have been interviewed and evaluated based upon a <br />set of pre-established criteria. This work was performed by HKT in conjunction with Pat Goddard <br />and Jim McLaughlin. HKT will have 1 or 2 final vendors selected for furniture by next PBC meeting, <br />which will define the actual furniture lines that are available to the Town. HKT will meet with user <br />groups to define furniture needs and scope. HKT will make a presentation to the PBC on the <br />proposed furniture line and elements for approval. <br />8/12/08 <br />HKT has sent out requests to two furniture vendors for price quote requests on a sample office and <br />expect staff interviews to begin in September. <br /> <br /> <br />2.14 Interior Finishes HKT <br />6-10-08 <br />HKT reports that they are still waiting for a few submittals to come in so that they can build the color <br />palette for presentation of interior finishes. PBC is concerned with the timing of the interior finishes <br />selections and how they relate to the furniture. <br />PBC requests that HKT bring all the materials necessary for interior finishes review to the extent they <br />have received from the submittal process, to the next PBC meeting. <br />Color Scheme Board #1 was the general color direction that the PBC agreed upon. They also <br />expressed interest in combining Concept A (Views) + B (Light) for the way color would be used in the <br />building. <br />7/8/08 <br />HKT presented multiple color and sample schemes of the interior finishes as well as floor tile <br />patterns and accent wall coordination. The PBC reviewed the color and sample options and agreed <br />upon the following actions: <br />The items from the scheme that the PBC would like to reconsider or get larger samples of are the <br />following: <br />7 <br /> <br />