11 July 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />08 July 2008 <br />Date & Time: , 7:00PM <br />It was discussed that some cost may well be due to the subcontractor to accommodate the changes. <br />DPF requested that HKT pursue a timely resolution and determination of what the fair and <br />reasonable cost to the subcontractor should be so that the matter can be approved and the <br />windows ordered before they become an item that gives cause to delay. <br />7/8/08 <br />PCO was submitted after much deliberation and negotiation at $12,166.55, which reflects an <br />approximate $5,000 reduction from its original submittal. <br />Motion to approve PCO 24 in the amount of $12,166.55 <br />Motion: Bill Kennedy 2nd: Dick Perry Vote: Unanimous <br />2.20 Exterior Finishes HKT <br />6-10-08 <br />The mock up panel reflecting the exterior cladding and veneers was discussed. Some PBC members <br />visited the site to see the color options on the corrugated panel. The Architect expressed a desire to <br />use the Dove Grey color for the corrugated panel stating that it was in keeping with the monolithic <br />and utilitarian theme of the project from its development. Some PBC members expressed a <br />preference to the Antique bronze color, but deferred to the color choice presented by HKT. PBC <br />agreed the corrugated panel would be Dove Grey. <br />Discussion on the color choice for staining of the salt / Sand Shed, PBC asked for 4 color samples of <br />the proposed stain, Cottonwood, Belvedere Tan, Driftwood and Wood Smoke Grey. <br /> <br />7/8/08 <br />Selection of the Stain color for the Salt / Sand shed was deferred to the next meeting, however Zinc <br />Grey was selected as the color of the Roof for the Cold Storage Building. <br /> <br /> <br /> <br />2.21 Pco 29 <br />7/8/08 <br />A pco was received in the amount of $112,238.60 for the replacement of existing sanitary piping at <br />the site. The situation was discussed and it was agreed that continued evaluation of the existing <br />conditions and engineering needed to take place prior to any considerations of the pco. <br />2.22 Existing Site Drainage <br />7/8/08 <br />HKT explained that there was apparently an ongoing matter of site run-off that was occurring, as <br />apparently storm water run-off comes from the Knights of Columbus site and lands on another <br />abutters site, which then, when conditions worsen, overflows onto the DPW site. HKT was seeking <br />direction. The PBC expressed that this was not a PBC matter to control. <br />8 <br /> <br />