11 July 2008 <br />Meeting Minutes <br />Lexington Permanent Building Committee (PBC) <br />Location: Cary Memorial Hall-Estabrook Meeting Room <br />08 July 2008 <br />Date & Time: , 7:00PM <br />In addition, the PBC would like to take another look at the following items: <br />1) Floor pattern with selected colors for the linoleum in the lunchroom and adjacent corridor <br />2) Floor Finish in corridor that connects the central storage from the administration building. <br />Currently we own walk off carpet Ï Bill Hadley worried about the ability to keep that product looking <br />good. <br />3) Paint color at channel detail and railing at stair in main lobby <br />Items that were acceptable included: <br />1) Green colored carpet with terra/gold accent strands from Option #1 (Option #4 is a back up color) <br />2) Porcelain Tile Ï Eco Green <br />3) Three linoleum colors (green, yellow and terra) <br />4) Gray walk off carpet <br />5) Paint colors: light (off white) base plus gold and sage accent colors <br />6) Maple wood caps, rails, wall <br />7) Composite material for low walls in engineering <br />8) Laminate color for work surfaces <br />9) Rubber flooring <br />Some changes to these items (even some of the acceptable items) will happen as we refine the <br />schemes and get more samples here at the office. <br /> <br /> <br />2.15 PCO 26 HKT/CTA <br />6-10-08 <br />PCO 26 was submitted by CTA at an approx value of $17,000.00 to be done on T&M, to respond to <br />the needs of the DEP / LSP required work to relocate stockpiled material and rough grade site for <br />the Weston and Sampson / DEP work. HKT had reservations about accepting the pco as written <br />based upon some of the unit costs therein. <br />HKT has written a Construction Change Directive( CCD) to instruct CTA to perform the required work <br />on a T&M Basis with an upset of $20,000, as the work needs to be completed asap. This will allow <br />HKT the opportunity to continue working with CTA on what the final unit prices should be for the <br />work, and to determine the final cost. <br />DPF will authorize the CCD through Finance and Town Manager when received for timely start of the <br />work. <br /> <br /> <br />2.18 PCO 24 Record <br />6/10/08 <br />PCO # 24 as previously submitted by CTA at an value of $17,452.11 for changes to the window <br />muntins. HKT is still reviewing these costs, as is CTA. There are reports that the cost proposal has <br />been reduced some 30%. <br />DPF stated that the changes warranted were not in their opinion something that could have been <br />determined in the bid process, that the plans and specs were based upon manufacturers <br />information that proved to be inaccurate, therefore requiring a change. <br /> <br /> <br />7 <br /> <br />