|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2010-10-12-PBC-min.exe
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2010
>
2010-10-12-PBC-min.exe
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:35 PM
Creation date
4/17/2015 11:41:00 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> TOWN OF LEXINGTON <br />Department of Public Facilities <br />MeetingMinutes <br />LexingtonPermanentBuildingCommittee(PBC) <br />ExecutiveSession <br />MeetingDate&Time:12October,2010,8:00PM <br />nd <br />Location:201BedfordStreet,2Flr.ConferenceRoom <br />Attendees:Staff&Guests: <br />JonHimmel,PBCCarlValente,TownManager <br />EricBrown,PBCKevinBatt,TownCounsel <br />CarlOldenburg,PBCMarkW.Barrett,DPF <br />DickPerry,PBCLaurieLucibello,DPF <br />PeterJohnson,PBC <br />BruceCreager,PBC <br />10/12/10 <br />MotiontomovetoExecutiveMeetingSessionforthepurposeofpotentiallitigation. <br />nd <br />Motion:EricBrown2:DickPerryVote:Unanimous <br />PeterJohnson:YES <br />DickPerry:YES <br />EricBrown:YES <br />BruceCreager:YES <br />CarlOldenburg:YES <br />JonHimmel:YES <br />TownCounselKevinBattreceivedacopyofSGHreportontheVehicleWashBayandtheArchitects <br />agreement.HeisatPBCtogetanunderstandingofhowissuescameabout. <br />DiscussionSummary <br />Training <br />O&Mmanualswerereceivedfortheoperationoftheequipment,althoughtheycontainednothingfor <br />preppingpriortowashing. <br />DPWstaffwastrainedintheoperationofequipmentbythevendor.PBCisnotawareofanyprewashprep <br />training. <br />Originaldesignhadthevehiclewashadjacenttomainbuilding.Tocutprojectcostthewashbaywasmoved <br />intothemainbuilding.HKThiredanIndustrialDesignconsultant,Weston&Sampson.PBCreliedonthe <br />design.ItwasnotmadecleartoPBCthattheIndustrialEngineerwasnotexperiencedinͻźƓķƚƚƩͻcarwash <br />design. <br />esignedtoreusewaterbuttheamountofsaltinthewater,inwinterconditions,wasnot <br />Washbayisd <br />takenintoconsideration. <br />201 BEDFORD STREET • LEXINGTON, MASSACHUSETTS 02420 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.