|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2014-04-09-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2014
>
2014-04-09-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:45 PM
Creation date
8/25/2014 3:21:52 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
recommendationoftheArchitectandOwnersProjectManager,fortheEstabrookSchool <br />Project(EricB.,PhilC.)TheMotionwasapproved 50 <br />MotiontoapprovetransferfromtheContingencyLine58220intheamountof$160,327to <br />Line58202ConstructionCostsforChangeOrdersNos.11,12and13fortheEstabrookSchool <br />Project(EricB.,DickP.)TheMotionwasapproved 50 <br />MotiontoApprovePCOLogNumber203(a),additionalACMabatementanddisposalscope <br />per3.18testresultsintheamountof$25,392,nottoexceedforsteelcolumn <br />disposal/abatement,subjecttoArchitectandhǞƓĻƩƭProjectManagerreview(DickP.,Eric <br />B.)TheMotionwasapproved 50 <br />JeanreviewedBudgetSummaryCMatRiskChangeOrdersintheamountof$721,021.00.TheGMP <br />Contingency(languagefromCMAgreementandD/ƭΜwasreviewedanddiscussedbytheCommittee <br />regardingdollarsavailabletocoverthenetamountofadditionalcostsresultingfromunforeseen <br />conditionsandeventsthatwerenotanticipatedatthetimetheCMawardsatradeorsubcontractoror <br />thepartiesexecutedtheGMPAmendmentandwhicheventsdonotresultinorconstituteachange <br />order.ContingencyLogLineItems25,28(a)and(b),42,and43werediscussedindetail. <br />AsofMarch2014,thedeltabetweentheprojectedandtheactualSDCCashFlowamountis$675,311. <br />TheCommitteereviewedandapprovedtheMarchInvoicesfrom(A)DiNiscoDesign(i)$44,175 <br />(ContractAdministration);(ii)$1,913.76(RE12ProfessionalConsultingServicesreHazardousMaterials); <br />and(iii)$3,300(RE25ConstructionContainmentOversightandPerimeterAirMonitoringduring <br />DemolitionandAbatement);(B)ShawmutDesignandConstruction($480,340);and(C)HillInternational <br />($27,015). <br />MotiontoApproveShawmutApplicationforPayment#21intheamountof$480,340.00as <br />recommendedbytheArchitect,DiNiscoDesignandThehǞƓĻƩƭProjectManager,Hill <br />International(EricB.,PhilC.)TheMotionwasapproved 50 <br />2.Bridge/Bowman <br />Bridge&BowmanElementarySchool <br />1.CloseOutUpdate <br />TheFlooringatBridgeElementarySchool(Bridge)goesouttobidnextweek.Thegymflooris <br />analternate.NogymflooratBowmanElementarySchool(Bowman);PatGoddard,DirectorPublic <br />FacilitiesandDr.PaulAsh,SuperintendentofLexingtonPublicSchoolswilldiscuss.Rampswereadded <br />intherenovationprojecttofacilitateaccesstothestage,buttherehavebeenincidentsofkidsrunning <br />intorailings,sopaddingisbeingaddedforprotection.Continueddiscussionwillberequiredonthe <br />possibilityofremovingthenewlyinstalledrampsandinsteadinstallingliftsforaccessibility. <br />MarkBarrettprovidedprojectupdateswhichincludedpunchlistitems.Todayat4:00DPFreceived <br />wordthatthemechanical,electricalandplumbingpunchlistitemswereupdated,andithasbeensentto <br />Filedsubbiddersandthesurety.Thefiledsubbiddersareanxioustobepaid. <br />PBCMeeting041014Page2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.