Lexington Permanent Building Committee <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br />7.80 Transfer <br />2/14/13 <br />Motion to approve $1,447,323 in funds from contingency line to Construction line based upon approval of Estabrook GMP. <br />Motion: Eric 2nd: Carl Vote: 5-0-0 <br />5/9/13 <br />d <br />extension (service) cost, and authorization of $79,508 to National Grid for gas line service upgrade from Grove Street to new <br />building. <br />Motion Phil 2 Chuck Vote 6-0-0 <br />nd <br />9/12/13 <br />and the pre construction services. <br />Motion Dick 2 Chuck Vote 7-0-0 <br />nd <br />7.84 Project Update <br />6/13/13 <br />PBC started with a project tour at Estabrook through the construction site. Committee was updated on the status of the LEED <br />certification and currently school is tracking towards Silver as planned. MSBA reimbursement of 2% if LEED Silver is met is @ <br />$600,000.00. <br />7/11/13 <br />Collaborative Partners presented various photos of construction areas of the new building. New sub contractors on board. 70 <br />workers on site daily. Curtain walls due on site in a couple of weeks, Metal panels due in August. Windows have been delivered. <br />Main roof is 90% tight. Water piping is 60% complete on floors 2 and 3, 40% complete on the first floor. Half of the light fixtures are <br />on site. Monday 7/15/13 National Grid will be on site for the gas installation. Tuesday 7/23/13 the water will be tied in. Everything <br />is considered on schedule. <br />PBC has requested FF&E updates for August Meeting. PBC would like to see what is being proposed prior to going out for bid. <br />DiNisco will bring to next meeting. <br />8/8/13 <br />CP made presentation on project status <br />nd <br />hoisted, concrete pans being poured in stairs, water testing on windows complete, binder course next week. <br />PBC asks is their a contingency plan if Shawmut fails? <br />9/12/13 <br />CP made a presentation on project status: <br />Schedule shows 9 days lag. Discussion on levels of manpower on site and expectations for timely completion. Shawmut <br />representatives confident they will make schedule, further they claim subs are underbiling which would explain lower monthly <br />requisitions. <br />Shawmut reports 105 men on site this week with 30 carpenters. <br />SC is to be 1/27/14 with students starting on 2/24/14 <br /> Page 4 of 6 <br /> <br />