Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-07-11-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2013
>
2013-07-11-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:58:58 PM
Creation date
8/25/2014 3:03:49 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br />7.80 Transfer <br />2/14/13 <br />Motion to approve $1,447,323 in funds from contingency line to Construction line based upon approval of Estabrook GMP. <br />Motion: Eric 2nd: Carl Vote: 5-0-0 <br />5/9/13 <br />d <br />extension (service) cost, and authorization of $79,508 to National Grid for gas line service upgrade from Grove Street to new <br />building. <br />Motion Phil 2 Chuck Vote 6-0-0 <br />nd <br />7.84 Project Update <br />6/13/13 <br />PBC started with a project tour at Estabrook through the construction site. Committee was updated on the status of the LEED <br />certification and currently school is tracking towards Silver as planned. MSBA reimbursement of 2% if LEED Silver is met is @ <br />$600,000.00. <br />7/11/13 <br />Collaborative Partners presented various photos of construction areas of the new building. New sub contractors on board. 70 <br />workers on site daily. Curtain walls due on site in a couple of weeks, Metal panels due in August. Windows have been delivered. <br />Main roof is 90% tight. Water piping is 60% complete on floors 2 and 3, 40% complete on the first floor. Half of the light fixtures <br />are on site. Monday 7/15/13 National Grid will be on site for the gas installation. Tuesday 7/23/13 the water will be tied in. <br />Everything is considered on schedule. <br />PBC has requested FF&E updates for August Meeting. PBC would like to see what is being proposed prior to going out for bid. <br />DiNisco will bring to next meeting. <br />7.85 Interior Colors <br />4/11/13 <br />Ken DiNisco stated that a final discussion should take place soon on interior colors. <br />Ken will work directly with Carl and Eric to schedule a time too meet and review same, perhaps as early as next week. Ken will be <br />sure to include Sandy T. in those discussions. <br />5/9/13 <br />Carl attended meetings with the Architects and school Principals to review interior colors. <br />7.87 Application for Payment <br />7/11/13 <br />Motion to approve application for payment # 12, in the amount of $2,014,812.67 from Shawmut Construction as approved and <br />recommended by the Architect of Record, DiNisco Design Partnership and Owners Project Manager Collaborative Partners. <br />Motion Eric 2 Dick Vote 5-0-0 <br />nd <br /> Page 3 of 4 <br /> <br />