Lexington Permanent Building Committee <br />6/13/13 <br />Motion to approve UST removal contract award, Bid #13-77, pending successful bid review and reference checks; amount not to <br />exceed $35,000.00. <br />Motion Dick 2 Phil Vote 6-0-0 <br />nd <br />Motion to approve Additional Service amendment to Design Partnership of Cambridge to include scope of EBI Consulting for <br />hazardous materials abatement monitoring and sampling in the amount not to exceed $80,000.00. <br />Motion Phil 2 Eric Vote 6-0-0 <br />nd <br />Motion to approve requisitions as listed below for the Bridge & Bowman Renovation projects. <br />Dismantle-dispose re-install existing library shelves both schools <br />Creative Office Pavilion (40019490-58212) $4,335.00* <br />Shadrack Construction (40019490-58219) $1,100.00 <br />40019490-58212 <br />Shadrack- Construction support during moves NTE $9,000.00 <br />40019490-58210 Telephone <br />Custom Computer voip switches Bridge $12,221.20 <br />Custom Computer voip switches Bowman $12,221.20 <br />40019490-58212- Bridge FF&E <br />School Outfitters $1,801.96 <br />Lakeshore Learning $ 817.96 <br />Quill $3,399.90 <br />Office Depot $5,699.64 <br />Virco MFG $8,352.98 <br />Shadrack construction Reading Rm. Shelves $8,850.00 <br />Breftford Furniture Library Circulation $10,832.32* <br />*authorized under interim authorization procedures by Pat Goddard, requiring PBC support. <br />Motion Eric 2 Phil Vote 6-0-0 <br />nd <br />4.66 Cancellation of VAT work <br />4/11/13 <br />DPC presented a proposed Credit Change order to the PBC that would eliminate the removal and replacement of corridor flooring <br />at the Bridge school. TLT never completed this scope of work in phase 1 and would be challenged to complete it in this phase along <br />with phase 2 work. By crediting this work TLT will also credit the abatement of caulking between masonry walls and steel columns <br />that exists behind the lockers in these hallways. The lockers must be removed to replace the floor and that is when they were <br />going to abate the caulking. (The caulking is contained, non-friable, and not a danger. Any column caulking that can be removed <br />with locker replacement will still be completed. The credit from TLT for this work will be $63,237.00. The Town will pursue <br />rebidding this work next summer. <br />Motion to accept change proposal #169 as a credit in the amount of $63,237.00 removing VAT/VCT corridor flooring from the <br />Bridge Scope along with related column caulking abatement behind corridor lockers. <br />Motion Carl 2nd Dick Vote 5-0-0 <br />7.0 Estabrook Elementary <br />7.66 Change Order Detail <br />11/8/12 <br />PBC raised a question regarding the percentage mark ups to change orders (10% / 5%) and what happens on negative change <br />orders? CP to discuss at next meeting. <br /> Page 5 of 8 <br /> <br />