|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-12-13-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2012
>
2012-12-13-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
8/25/2014 2:50:21 PM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee 13 December 2012 <br />7.70 Flooring <br />11/8/12 <br />Discussion on variances in the overall system depth of the various manufacturers for the Stage and gym flooring products as <br />specified. Final discussion was to base the sub floor elevation on the deepest system requirement and incorporate transition strips <br />if / where needed to accommodate final variance based on final flooring choice. <br />7.71 Construction Camera <br />12/13/12 <br />DPF advised that a proposal had been developed ($9,697) to install maintain and monitor a video camera that would record and <br />monitor the construction project from a single point of view. The proposal was not accepted. <br />7.72 Web based electronic management of submittals <br />12/13/12 <br />A proposal had been submitted by DDP for web based management of project submittals in the amount of $13,634.50. This issue <br />was discussed and the PBC felt that more information would be needed as this should be part of basic services. <br />7.72 Shawmut Payment Request <br />12/13/12 <br />Motion to approve Shawmut Monthly Requisition #5 in the amount of $583,482.00 <br />Motion 2nd Vote <br />7.73 DiNisco Design Partnership Reimbursable expense #18 for acoustical survey <br />12/13/12 <br />DPF had requested a sound study so that we would have information to use for our planning purposes and not have to wait 18 <br />months to get data, since the two projects are very similar. <br /> at <br />Howe Manning school to anticipate performance at Estabrook. <br />Motion 2nd Vote <br />7.74 General Update on Project <br />12/13/12 <br />Filed Sub Bids to come in 12/19/12 <br />GMP due 12/31/12 Target +/-$32,250,000 <br />PBC Mtg for approval on 1/3/13 <br />PBC needs date for when site visit to look at samples w/ other materials to be on site as well. <br />Meeting Adjourned <br />Motion to Adjourn 12/13/12 8:45 PM <br />Motion: Dick 2: Phil Vote: unanimous <br />nd <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.