|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Townwide Facilities Master Planning Committee - TFMP
>
Reports
>
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:03:12 PM
Creation date
4/4/2014 2:11:20 PM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHOOL CENTRAL ADMINISTRATION <br />Description <br />The School Central Administration has been located in the Old Harrington School <br />since 2007. The property has the following characteristics: <br />LOCATION: 328 Lowell Street <br />YEAR OPENED: 1956 <br />LOT SIZE: 8.69 acres* <br />BUILDING SIZE: 46,637 GSF <br />OWNER: Town of Lexington <br />ZONING: RO (One - Family Dwelling Residential District) <br />CURRENT USE: Central School Administration offices <br />BUILDING ASSESSED VALUE (FY13): $18.90 million* <br />LAND ASSESSED VALUE (FY13): $5.23 million* <br />TOTAL ASSESSED VALUE (FY13): $24.13 million* <br />SCHOOL ADMIN. BUILDING <br />328 LOWELL ST. *Note: This includes the New Harrington School building and property. The <br />buildings and lot are not individually assessed. <br />Previous Analyses <br />The 2009 Lexington Public School PK -12 Master Plan by Design Partnership of <br />Cambridge focused on space and program needs of Central Administration as <br />opposed to physical building conditions. <br />Recent Actions <br />Recent capital expenditures to accommodate the School Central Administration in the <br />Old Harrington School have included the following: <br />• Convert Old Harrington for Central Administration $400,000 (2008) <br />• Remove modular classrooms $30,000 (2010) <br />• K -5 Curriculum $45,000 (2011) <br />• Paving $100,000 (2012) <br />• Wall Units $56,000, Print Shop $312,000 and Human Resources $29,500 (2013) <br />34 LEXINGTON, MASSACHUSETTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.