|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
DISSOLVED COMMITTEES
>
Ad hoc Townwide Facilities Master Planning Committee - TFMP
>
Reports
>
2013-08-30-Ad hoc Townwide Facilities Master Planning Committee (Final Report of Committee)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 4:03:12 PM
Creation date
4/4/2014 2:11:20 PM
Metadata
Fields
Template:
Archives
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TOWN OFFICE BUILDING <br />Description <br />The Town Office Building is next to the Cary Memorial Building and adjacent to the <br />Police Station. The property has the following characteristics: <br />TOWN OFFICE BUILDING <br />1625 MASSACHUSETTS AVE. <br />LOCATION: 1625 Massachusetts Avenue <br />YEAR OPENED: 1927 <br />LOT SIZE: Not separately sized* <br />BUILDING SIZE: 22,9000 SF <br />OWNER: Town of Lexington <br />ZONING: RS (One - Family Dwelling Residential District) <br />BUILDING ASSESSED VALUE (FY13): Not separately <br />assessed* <br />LAND ASSESSED VALUE (FY13): Not separately assessed* <br />TOTAL ASSESSED VALUE (FY13): Not separately <br />assessed* <br />*Note: This includes the Police Station and Cary <br />Memorial Building, which are located on the same <br />property, lot size 3.43 acres, land assessed value $639,000, building assessed value <br />$7.43 million, total assessed value $8.06 million. <br />Previous Analyses <br />The 2008 Lexington Town Hall Study, which was prepared by Bargmann Hendrie + <br />Archetype, Inc. and funded with a CPF allocation, indicated that the program space <br />needs of some departments were greater than the building spaces provided and there <br />were accessibility issues. In 2009, $30,000 of additional funds were appropriated to <br />expand the study (Town Office Building Renovation presentation, 2010). Based on <br />the results of the study, existing furniture and file systems have been surveyed and <br />incorporated into space planning to account for the deficit of space. <br />Recent Actions <br />In 2010, Annual Town Meeting approved $1,825,000 to fund the needed renovation. <br />Of that total amount, $325,000 was from the General Fund [debt], and $1,500,000 <br />was cash from the CPF. <br />Recommended Actions <br />None. The Committee finds the Town Office Building is in sound condition and <br />warrants no substantial changes. <br />14 LEXINGTON, MASSACHUSETTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.