If there are two components, some of the work done in the first component will be undone during construction <br />of the second component. Additionally, this involves two contracts, which is likely to involve two contractors <br />with two entirely different sets of subcontractors; this will create a warrantee problem at the very least. If the <br />opening is delayed, it may be possible to improve the electrical design for accommodating audiovisual <br />equipment. However, the delay will further disrupt Recreation Department programs because they will be <br />losing space they use for programs and storage in the Cary Memorial Building when renovations of that <br />building begin in the summer of 2014. The delay also requires the Senior Center to remain in the Muzzey <br />Building until the summer of 2015. <br />Mr. Himmel expressed his opinion that the issue needs further exploration. He suggested two negative <br />impacts related to delaying the second component: <br />The level of interruption to the Community Center clientele and staff would be significant during a <br />separate HVAC phase; and <br />The total capital cost of a separate HVAC phase would be greater. <br />He suggested that the details are still unfolding regarding cost, schedule, and the energy conserving/fresh air <br />HVAC design. <br />Ms. Ciccolo and Mr. Pato noted that the scheduling issues will be decided by the BoS. The information <br />presented at this meeting will be shared with the BoS tonight, and it is anticipated that they will make a <br />decision at their meeting on February 3, 2014. <br />5.Next Meeting: <br /> The next meeting is on Tuesday, February 4, 2014. The agenda will include the BoS position <br />regarding the HVAC renovations, identified assumptions, answers to comments, and the allocation/dedication <br />of space in the Community Center. <br />6.Adjourn: <br /> A motion was made and seconded to adjourn the meeting at 10:00 .. The motion passed. <br />AM <br />VOTE: 8-0 <br />These minutes were approved on February 4, 2014. <br />Materials distributed/used at the meeting: <br />Public Meeting Agenda, January 27, 2014, AhCCAC <br />Meeting Schedule and Work Plan—Revised for 01/22/2014 <br />Summary of Comments from Open House; Harry Forsdick and Florence Koplow, January 15, 2014 <br />Recommendations Based on Comments Received at the Open House, Florence Koplow and Harry Forsdick, <br />January 15, 2014 <br />Comment Cards Categorized – Sorted Category 1; spreadsheet prepared by Florence Koplow and Harry <br />Forsdick, January 15, 2014 <br />Comment Cards Categorized – Sorted Category 2; spreadsheet prepared by Florence Koplow and Harry <br />Forsdick, January 15, 2014 <br />Open House Comment Cards and Suggestions as We Go Forward, Harry Forsdick and Florence Koplow, <br />January 27, 2014; PowerPoint <br />Memo from Ms. Ciccolo to the Lexington Board of Selectmen; Subject: Status Report, with Recommendations <br />Regarding Future Phased Build-out of the Lexington Community Center; January 24, 2014 <br />Letter from Mr. Sirkovich, SBA, to Mr. Goddard and Committee Members, January 27, 2014 <br />Lexington Community Center Project Schedule, January 24, 2014, prepared by SBA <br />Lexington Community Center Phase 1A; Hard Costs and Soft Costs, 1/26/2014, prepared by SBA <br />Phase 1 Floor Plans prepared by SBA, January 27, 2014 <br />3 <br />