|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2013-11-14-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2013
>
2013-11-14-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2018 4:17:37 PM
Creation date
1/22/2014 11:24:29 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Not much discussion, DPW less involved in these areas. <br /> These might be discussed with other Bike Committees and public safety. <br />Chapter 9 (Maintenance Recommendations) Comments: <br /> John said that a phone call is still the best way to report problems. Lexington has <br />Commonwealth Connections, but it is not yet hooked up to DPW. <br /> On the condition of the Bikeway: The list of problem areas – roots, edge decay, <br />etc. -- has been prepared and plans are underway to address the unsafe areas. <br />John will give the Bike Committee a timeline for improvements; it will take a few <br />months to compile. Next up is another culvert replacement near Seasons Four. <br />The root work may be part of the paving contract or a separate paving contract. <br /> Detours during root work and other repairs – especially between Bedford and <br />Hartwell intersections -- need to be carefully considered and publicized. <br />Chapter 10 (Future Improvements) Comments <br /> Widening the Bikeway would involve a huge expense. <br /> Improvements to the Hancock Street approach may be scheduled for next <br />season. <br /> There are some sections of the Bikeway that could accommodate an auxiliary <br />path on either side to take the pressure off heavy usage. If the town decides to <br />build stone dust paths adjacent to the Bikeway, this decision should be made <br />before paving. Conservation Commission approval will be needed in wetland <br />areas. Mike expressed interest in this project. <br />Chapter 11(Next Steps) Comments: <br /> Most of the items in this section are appropriate to leave with the individual towns <br />(e.g., ongoing maintenance). <br /> \[John Livsey plans to be in touch with his counterparts to start a discussion.\] <br />The committee thanked John for his efforts on behalf of the Bikeway. <br />Other Business: <br />Peggy has begun completing a 24-page application to the League of American <br />Bicyclists for Bike Friendly Community status for Lexington. She is seeking help from <br />various town staff and committee members for expertise, advice, data, essay writing. <br />The meeting was adjourned at 9:05 am. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.