Laserfiche WebLink
April 10, 2013 Adjourned Session of the 2013 Annual Town Meeting, cont.... <br /> 8:47 p.m. Article 10 (r) - Sidewalk Improvements and Easements-Planning Board <br /> Chairman Richard Canale reported support of the Board. DPW Director William Hadley <br /> reported on sequences for sidewalk and roadway work, to which Town Engineer John Livsey <br /> commented further. Article 10 (r) Adopted Unanimously. <br /> 8:53 p.m. Presented by Selectman Hank Manz. <br /> ARTICLE 14: APPROPRIATE FOR PUBLIC FACILITES CAPITAL PROJECTS <br /> MOTION: That the following amounts be appropriated for the following capital <br /> improvements to public facilities and that each amount be raised as indicated: <br /> a) Municipal Building Envelope and Systems -$173,954 for design, construction,repair and <br /> replacement projects for the maintenance and upgrades of municipal buildings and <br /> systems, and that to meet this appropriation $173,954 be raised in the tax levy; <br /> b) School Building Flooring Program-$125,000 for replacing carpet,vinyl the and ceramic <br /> the flooring systems and all incidental costs related thereto, and that to meet this <br /> appropriation $125,000 be appropriated from the general fund unreserved fund balance; <br /> C) School Interior Painting Program-$150,000 for a school building interior painting <br /> program, and that to meet this appropriation$150,000 be appropriated from the general <br /> fund unreserved fund balance; <br /> d) School Window Treatments Extraordinary Repair-$50,000 for replacing window <br /> treatments with low maintenance solar shades, and that to meet this appropriation <br /> $50,000 be appropriated from the general fund unreserved fund balance; <br /> e) School Paving Program-$150,000 for designing, constructing and maintaining school <br /> parking and paved pedestrian surfaces, and that to meet this appropriation$150,000 be <br /> appropriated from the general fund unreserved fund balance; <br /> f) Lexington High School Overcrowding-Phase 3 Engineering and Improvements - <br /> $362,000 for engineering,remodeling and reconstructing rooms at Lexington High <br /> School and all incidental costs related thereto to alleviate overcrowding, and that to meet <br /> this appropriation the Treasurer,with the approval of the Board of Selectmen, is <br /> authorized to borrow$362,000 under M.G.L. Chapter 44, Section 7(3A) or any other <br /> enabling authority; <br /> g) School Security Standardization-$370,000 to standardize the elementary and middle <br /> schools for access control and video security, and that to meet this appropriation <br /> $370,000 be appropriated from the general fund unreserved fund balance; <br /> h) Installed Wall Units-Air Conditioner-$56,000 for installation of four air conditioning <br /> wall units in the School Central Administration lower level professional <br /> development/conference rooms, and that to meet this appropriation $56,000 be <br /> appropriated from the general fund unreserved fund balance; <br /> i) School Building Envelop and Systems Program-$235,000 for design,repairs and <br /> modifications to prevent deterioration of school building exterior and building systems, <br /> and that to meet this appropriation $235,000 be appropriated from the general fund <br /> unreserved fund balance; <br /> j) Clarke Middle School Bus Loop-$35,000 for a study of bus loop construction on the <br /> Stedman Road side and to identify solutions to address the long-term need to separate car <br /> and bus traffic at the Clarke Middle School, and that to meet this appropriation$35,000 <br /> be appropriated from the general fund unreserved fund balance; <br /> k) Hastings School Kitchen Renovation-$90,000 for necessary upgrades to the kitchen at <br /> the Hastings School, and that to meet this appropriation $90,000 be appropriated from the <br /> general fund unreserved fund balance; <br /> 1) Print Shop Renovation-$312,000 for engineering,remodeling,reconstructing and making <br /> extraordinary repairs to the Public Schools Print Shop and all incidental costs related <br /> thereto, and that to meet this appropriation the Treasurer, with the approval of the Board <br /> of Selectmen, is authorized to borrow $312,000 under M.G.L. Chapter 44, Section 7(3A) <br /> or any other enabling authority; <br /> in) Public Facilities Vehicle Replacement-$80,000 for a replacement vehicle for the <br /> Department of Public Facilities and all incidental costs related thereto, and that to meet <br /> this appropriation the Treasurer,with the approval of the Board of Selectmen, is <br /> authorized to borrow$80,000 under M.G.L, Chapter 44, Section 7(9) or any other <br /> enabling authority; <br /> n) Public Facilities Bid Documents -$175,000 for professional services to produce design <br /> development, construction documents, and bid administration services for capital <br /> projects, and that to meet this appropriation $75,000 be appropriated from the general <br /> fund unreserved fund balance and$100,000 be appropriated from the Unbudgeted <br /> Reserve of the Community Preservation Fund; and <br /> o) Human Resources Office Renovation-$29,500 for redesigning and renovating the School <br /> Human Resources Office and the Office of the Assistant Superintendent for Human <br /> Resources, and that to meet this appropriation$29,500 be appropriated from the general <br /> fund unreserved fund balance. <br />