Laserfiche WebLink
April 10, 2013 Adjourned Session of the 2013 Annual Town Meeting, cont.... <br /> b) Cary Memorial Library RFID Conversion Project-$124,000 for converting the Library's <br /> materials and equipment to a Radio Frequency ID system, and that to meet this appropriation <br /> $124,000 be appropriated from the general fund unreserved fund balance; <br /> c) Head End Equipment Replacement-Phase IV-$60,000 for replacing equipment at the Head <br /> End of the Town/School Wide Area Network, and that to meet this appropriation$60,000 be <br /> appropriated from the general fund unreserved fund balance; <br /> d) MIS Technology Improvement Program-$160,000 for storage area network,blade server <br /> technology and virtualization software, and that to meet this appropriation $160,000 be raised <br /> in the tax levy; <br /> e) Network Redundancy and Improvement Plan-$36,000 to install redundant network paths to <br /> selected town buildings via additional fiber runs and wireless links, and that to meet this <br /> appropriation $36,000 be appropriated from the general fund unreserved fund balance; <br /> f) Replace Townwide Telephone Systems-Phase 11- $146,000 for new telephone systems in <br /> town and school buildings, and that to meet this appropriation $146,000 be raised in the tax <br /> levy; <br /> g) Townwide Electronic Document Management System-Phase III-$60,000 for continued <br /> upgrading of the Document Management System, and that to meet this appropriation$60,000 <br /> be appropriated from the general fund unreserved fund balance; <br /> h) Hastings Park Gazebo Rehabilitation/Design and Engineering-$15,000 for funding the <br /> design and engineering needed to renovate the Gazebo, and that to meet this appropriation <br /> $15,000 be raised in the tax levy. <br /> i) Street Improvements and Easements -$1,890,074 for road reconstruction,repairs and <br /> resurfacing by the Department of Public Works and all incidental costs related thereto, and to <br /> take by eminent domain,purchase or otherwise acquire any fee, easement or other interest in <br /> land necessary therefor, and that to meet this appropriation$1,890,074 be raised in the tax <br /> levy, and authorize the Town to accept and expand any additional funds provided or to be <br /> provided by the Commonwealth of Massachusetts through the Massachusetts Highway <br /> Department; <br /> j) Townwide Culvert Replacement-$390,000 for the repair and replacement of culverts and all <br /> incidental costs related thereto, and that to meet this appropriation$390,000 be raised in the <br /> tax levy; <br /> k) Storm Drainage Improvements and NPDES Compliance -$340,000 for construction and <br /> reconstructing storm drains and all incidental costs related thereto, and that to meet this <br /> appropriation $155,155 be raised in the tax levy, and the Treasurer, with the approval of the <br /> Board of Selectmen, is authorized to borrow$184,845 under M.G.L. Chapter 44, Section 7(1) <br /> or any other enabling authority; <br /> 1) DPW Equipment Replacement-$640,000 for the cost of departmental equipment for the <br /> Department of Public Works and all incidental costs related thereto, and that to meet this <br /> appropriation the Treasurer, with the approval of the Board of Selectmen, is authorized to <br /> borrow$640,000 under M.G.L. Chapter 44, Section 7(9) or any other enabling authority; <br /> in) Hastings Park Irrigation-$73,000 for the installation of an automated in-ground irrigation <br /> system at Hastings Park, and that to meet this appropriation$73,000 be appropriated from the <br /> general fund unreserved fund balance; <br /> n) Hydrant Replacement Program-$100,000 for the replacement of fire hydrants and all <br /> incidental costs related thereto, and that to meet this appropriation$50,000 be appropriated <br /> from Water Retained Earnings and$50,000 be appropriated from the general fund unreserved <br /> fund balance; <br /> o) Comprehensive Watershed Stonnwater Management Study and Implementation-$390,000 <br /> to fund watershed storm management projects and all incidental costs related thereto, and that <br /> to meet this appropriation the Treasurer, with the approval of the Board of Selectmen, is <br /> authorized to borrow$390,000 under M.G.L. Chapter 44, Section 7(1) or any other enabling <br /> authority; <br /> p) Townwide Signalization Improvements -$125,000 for traffic and pedestrian signals, and that <br /> to meet this appropriation$125,000 be appropriated from the general fund unreserved fund <br /> balance; <br /> q) Hartwell Avenue Infrastructure -$600,000 for planning and design of roads, sidewalks, <br /> mixed use pathways, and/or bridge repair in the Hartwell Avenue corridor, and that to meet <br /> this appropriation the Treasurer,with the approval of the Board of Selectmen, is authorized to <br /> borrow$600,000 under M.G.L. Chapter 44, Section 7(22) or any other enabling authority; <br /> r) Sidewalk Improvements and Easements -$600,000, including$200,000 for the Hartwell <br /> Avenue Corridor and$400,000 for other town locations, for rebuilding and repaving existing <br /> sidewalks and constructing new sidewalks and all incidental costs related thereto, and to take <br /> by eminent domain,purchase or otherwise acquire any fee, easement or other interest in land <br /> necessary therefor; and that to meet this appropriation the Treasurer, with the approval of the <br /> Board of Selectmen, is authorized to borrow$600,000 under M.G.L. Chapter 44, Section 7(6) <br /> or any other enabling authority; and <br />