Laserfiche WebLink
User Group Outreach List: Ms. Ciccolo noted this is an effort to get an understanding of the types of <br />groups that are interested in using the Community Center; it does not identify all programs that <br />eventually will take place at the center. <br />Proposed 2013 Meeting Schedule and Work Plan Revised 101112013 [sic]: <br />➢ There are two typos: the revision date is 10/11/2013 (not 10/1/13) and the tour on October 17, <br />2013 is in Belmont (not Brookline). <br />➢ The timeline for Phase 1, i.e. the interim phase that is expected to go into effect in approximately <br />six months, contingent on funding approval by the November 4, 2013 Special Town Meeting (fall <br />2013 STM), includes: <br />• October 21S This Committee will update the Board of Selectmen. The date will be added to <br />the Work Plan. <br />• Late October: Community Preservation, Appropriation and Capital Expenditures Committees <br />will each be meeting before the fall 2013 STM to vote on their positions regarding the Phase 1 <br />Community Center funding. These dates will not be added to the Work Plan because the <br />AhCCAC will not be attending those meetings. <br />➢ The timeline for Phase 2, i.e. the long term plan, contingent on funding approval by the spring 2014 <br />Annual Town Meeting, includes: <br />• October 22 d : an evening meeting for soliciting comments from stakeholders and the general <br />public when this Committee should focus on listening. The information gathered will assist in <br />preparing the long term plan. <br />• October 28 a meeting when SBA will present questionnaire results. <br />• November 12 evening meeting for stakeholders and the general public to provide additional <br />comments on the draft Space Needs Analysis. <br />• Early December: targeted for completing the identification of the size and scope of Phase 2, <br />including the need for an addition of a large, multi - purpose space or other elements in the <br />long -term build -out. <br />• January: targeted for gathering financial information to be used in the funding request at the <br />spring 2014 Annual Town Meeting. <br />➢ Ms. Koplow noted that the Harwich Community Center is particularly impressive and asked if it <br />would be possible to invite the Harwich Community Center Executive Director to a meeting to <br />speak. Harwich is two hours away, but when the Community Center Task Force (CCTF) was still <br />meeting, the Executive Director offered to come to Lexington to speak. Ms. Ciccolo said she <br />would keep this in mind, but at the moment there is little leeway in the schedule. It was agreed that <br />Committee members should read the Harwich section in the CCTF report. <br />➢ While developing Phase 2 of this project, this Committee will continue to get updates on Phase 1. <br />4. Guiding Principles from CCTF Final Report 10/26/12: Ms. Hussong presented a PowerPoint summary <br />of the CCTF report, describing the process the committee pursued when developing guiding principles. <br />Ms. Wilson said that, in general, guiding principles should reflect the mission and core values of the project <br />and provide the basis for making decisions. She added that the CCTF guiding principles are a good starting <br />point for this project. The program objectives and space needs should be developed later. <br />ACTION ITEM: Ms. Koplow and Ms. Hussong agreed to develop an introduction and incorporate some <br />additional substance to the CCTF Guiding Principles and present their draft back to the committee. <br />5. Staff and Liaison Reports: A structural analysis of the building is currently being pursued. The cost <br />estimates for Phase 1 of the Community Center project should be finalized next week for presentation to <br />the Committee at its next meeting and then the Selectmen on October 21S The Community Preservation <br />Committee will discuss the funding for the project on October 24 It needs to be determined whether all <br />of the costs are Community Preservation Act eligible, which elements it will recommend to the fall 2013 <br />STM for funding from the Community Preservation Fund and therefore how much must come from the <br />general tax levy. If that STM approves funding for the project, those funds become available five days <br />after the close of Town Meeting, allowing the design process to begin. <br />