Laserfiche WebLink
ARTICLE 8 (e) <br />Project: <br />CPA Category: <br />Amount Requested: <br />Amount Recommended: <br />Visitor Center — Design Phase <br />Historic Resources <br />$68,950 <br />*Indefinitely Postponed* <br />Project Description: <br />This project is requesting CPA funds for design development and construction documents for <br />identified Visitor Center improvements. The improvements include: education space, space for <br />tour groups, a self - service kiosk, counter space for assisting visitors, veterans' display with a <br />visual connection to exterior memorials, retail space, a food vending area, rest rooms, and office <br />space. The building will be made fully handicapped - accessible and provide community meeting <br />space. The proposed project enlarges the building from 2,591 square feet to 6,566 square feet, <br />nearly a 4,000 square foot addition. <br />Project Goals and Objectives: <br />• Upgrade the space to enhance the experience of the visitor. <br />• Improve services available at the Visitor Center. <br />• Enhance the visitor experience so that visitors stay in Lexington longer and enjoy the <br />amenities available in our business district. <br />Project Benefit: <br />Originally opened in 1970 in anticipation of the nation's bicentennial, the Visitor Center has <br />served as an information hub to Lexingtonians as well as millions of guests from around the <br />world. On an annual basis, the building sees over 100,000 visitors - more than any other Town - <br />owned building. The last upgrade to the facility was when the restrooms were made <br />handicapped - accessible 10 years ago. Since then, the Center has been visited by over 1,000,OOC <br />visitors. <br />The anticipated benefits to the Town from this project include: <br />• increased revenue to Lexington, <br />• implementation of current technology to enable visitor self - service via the internet, <br />• education space for tours, <br />• a welcoming entrance from the Minuteman Bikeway, <br />• improved experience for our veterans, <br />• upgrades to the restrooms, and <br />• an improved retail display and resting area for visitors. <br />Funding Request: <br />The total cost of this project was $175,000, of which $68,950 was being requested in CPA funds. <br />Approved by a vote of (7 -2), this project will be indefinitely postponed for FY 14. It is <br />anticipated, however, that the application for the Visitor Center funding will come before the <br />CPC at a subsequent time. <br />12 <br />