|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-05-10-LBAC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Lexington Bicycle Advisory Committee-LBAC
>
Minutes
>
2010-2019
>
2012
>
2012-05-10-LBAC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2013 8:17:34 AM
Creation date
4/18/2013 8:17:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />APPROVED MEETING MINUTES <br /> <br /> <br />Committee Name: <br />Lexington Bicycle Advisory Committee <br /> <br />Date, Time, and Location: <br />May 10, 2012, Room 111, Town Office Building <br /> <br />Members Present: <br />Peggy Enders (Chair), Laurel Carpenter, Stew Kennedy, John <br />Frey, Bob Hausslein (FoLB Chair), Mike Tabaczynski, George Gagliardi, Sandra Shaw <br />(Recreation Committee Liaison), and Jerry Van Hook <br /> <br />Members Absent: Marita Hartshorn <br /> <br />Others present: David Giller, Rich Spencer, Patria Lanfranchi <br /> <br />1. Minutes: <br />The April minutes were accepted as distributed. <br />2. Bike Parking on Mass Ave and data collection: <br />Was approved by the <br />Selectmen for weekends this summer beginning May 19. Dave Kucharsky from <br />the Planning Department would like baseline traffic data before the bike corral is <br />installed, so volunteers will do counts on Saturday, May 12, between 8 am and 6 <br /> <br />pm. An hour or two may be covered on Sunday. <br />3. DCR Grant for Minuteman Bikeway User Information (update): <br />The Toole <br />Company has been hired; John Livsey will make the initial contact, since the <br />Town of Lexington is taking the lead in this 3-town project. (The total budget for <br />the map and Bikeway design was $48K; $37.5 was awarded with the balance <br />coming from “in kind” labor or fund-raising.) With the hiring of the Toole <br />Company designers, the “User Information for the Minuteman Bikeway” project <br />can finally launch. Volunteers will document the current conditions on and near <br />the Bikeway (using spreadsheet supplied by the project managers, taking photos, <br /> <br />etc). <br />4. Plans for Bikeway Drainage and Root Control (update) <br />: A culvert collapsed <br />between Bedford Street and Hartwell Avenue, so Bikeway has been closed on <br />that stretch for repairs. No word on when root control work will begin. <br />5. ACROSS Lexington signage on the Bikeway: <br />The Greenways Corridor <br />Committee has proposed to put up a number of small markers along the Bikeway <br />identifying the route of the first of the ACROSS Lexington trails. They hope to <br />mark the trail by September. <br />6. Complete Streets Workshop <br />: Richard Canale and Peggy attended ta 3-hour <br />workshop in Watertown. These workshops outline the current thinking of <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.