Laserfiche WebLink
CAPITAL EXPENDITURES COMMITTEE REPORT TO 2011 STM(NOVEMBER 14,2011) <br /> municipality and, if it—over time—accepted both schools (which we consider unlikely in less than a <br /> decade based on the MSBA's current evaluation of those schools' conditions being "generally good"), <br /> and if it were still providing about 32% reimbursement, the total cost to the Town would still be at least <br /> on the order of $54 million—and with the likely-by-then inflation, much more than that. So, with the <br /> emergency need to rebuild the Joseph Estabrook Elementary School, and replacement of the Maria <br /> Hastings Elementary School being the next higher priority,we don't find it reasonable to expect the Town <br /> would have an approved project for even the first of the Bridge and Bowman schools (including swing <br /> space) in less than 8 years and with MSBA funding assistance. Believing that, our reasonable expectation <br /> remains that the Town would face at least an $80 million cost for new Bridge & Bowman schools. This <br /> Committee believes the proposed project at about$22.7 million is the wise approach. <br /> – Then turning to the educational impact, the current state of both of those schools means those <br /> students do not have the benefit of what this Town considers the appropriate educational environment. <br /> While this Committee recognizes that new schools would correct that, we are fully prepared to accept the <br /> judgment of our School Superintendent, the Principals of these two schools, and the School Committee <br /> that the proposed project will do so, also. But most significant to this Committee, these proposed <br /> renovations to upgrade the Bridge and Bowman schools will be on line in just 2 years once construction <br /> has begun under the currently projected construction schedule—not some indeterminate period that may <br /> well be a decade and, even then, a period filled with numerous uncertainties, both known and unknown. <br /> Addressing now the creation of the appropriate educational environment for the students served by these <br /> two schools is the prudent approach. <br /> This Committee unanimously supports this proposed renovation project and believes it is the appropriate <br /> solution to the educational needs and proper use of our taxpayer's funds. <br /> Article 3: Funds Requested Funding Committee <br /> APPROPRIATE FOR Source Recommendation <br /> FIRE $180,000 General Fund Approve(5-0) <br /> COMMUNICATION (Cash) <br /> SYSTEM <br /> "To see if the Town will vote to appropriate a sum of money to upgrade the Fire Communication <br /> System...." <br /> "DESCRIPTION: The Fire Department has been experiencing recurring problems with its radio <br /> communications system in certain parts of the Town that have resulted in temporary losses of <br /> communications. A team composed of representatives from the Fire Department, Police Department, <br /> MIS, Dispatching and the Town's radio consultant are recommending the following upgrades to the radio <br /> system to stabilize the system and bring it to acceptable standards of reliability by making the following <br /> improvements: 1) the addition of two radio repeaters; 2) converting the repeater at the Dispatch Center to <br /> a transmitter; 3) installation of fiber optic communications lines to those portions of the system that are <br /> connected via leased copper phone lines; and 4) replace and upgrade two repeaters that are incompatible <br /> with the overall communications system. Some portion of the improvements may also include the Police <br /> radio system where fire and police share common radio sites." <br /> [Town of Lexington Warrant to the 2011 STM,November 14, 2011] <br /> The current Fire Department radio system has proven to be somewhat unreliable, thereby presenting a <br /> potential public-safety issue. This Article requests an FY2012 appropriation, using what is now <br /> understood to be excess tax-levy capacity, to provide a near-term upgrade to the radio system to enhance <br /> its reliability. (An additional appropriation is expected to be requested at the 2012 Annual Town Meeting <br /> for FY2013 D&E monies for an even-more-robust, redundant, radio system for all of the Town's needs, <br /> public safety and other—to be followed by a"construction"request in the FY2014 budget.) <br /> 2 <br />