Laserfiche WebLink
Lexington Permanent Building Committee <br />08 November 2012 <br />7.55 Ground Breaking <br />9/27/12 <br />Ground Breaking ceremony planned for 10 am on 10/18/12. DPF asked if anyone from PBC wished to speak. None volunteered. It <br />was suggested that parking will be at a premium so car pooling is suggested. <br />7.56 Budget Update <br />9/27/12 <br />Shawmut reports that current estimates ($33,825,200) are approx. 2.6 million over current budget. <br />A Plan for getting project back to budget was presented and discussed. <br />A list of VE items was included in the presentation which was reviewed It was decided to have a working group meeting with projct <br />representative and PBC and School Comm. Representatives to review VE list. <br />7.57 Steel & Concrete Package <br />9/27/12 <br />Shawmut requested approval of the steel & Concrete package that was recently bid. <br />4 steel bidders and 3 concrete bidders responded. Copies of responses distributed. <br />Cost of steel work was $513,474 dollars over budget and Concrete was $54,204 dollars over budget. <br />Concrete increase is attributed to 16 inch foundation walls actual over 12 inch walls assumed at time of budget development as <br />well as costs of rebar, along with routine cost fluctuations. <br />Steel costs attributed to increases in erection costs over what was assumed in budget, as well as an increase in number of steel <br />pieces 467 (extra pieces) even though overall tonnage was down. <br />Overall cost of steel package $5271,922. <br />Shawmut does not see any gains to be made in VE process on steel and concrete, in actuality a delay may cause further increased <br />costs. <br />Motion to approve the recommendation of Collaborative Partners and Shawmut for award of the required Steel and Concrete <br />package in the amount of $5,271,922 for the Estabrook School Project. <br />Motion Eric 2nd Chuck Vote 6 -0 -0 <br />7.58 VE Meeting <br />9/27/12 <br />Monday (10/1/12) working group meeting to be focused on VE review for Budget control. DPF to coordinate with School <br />representatives. <br />7.59 Excavation <br />9/27/12 <br />Excavation was started and approx. 4 trucks per day are transporting soil to Hartwell Ave for top soil removal. Tree removal and <br />retaining wall complete. <br />7.60 Proiect Update & Discussions of 10/11/12 <br />Project Budget Status <br />March $31,150,670 <br />July $31,150,670 (after 1.3 million in VE) <br />Sept. $33,825,201 (60% CD) <br />These figures represent a $2,674,531 delta to the original budget. <br />110 % Bid Docs expected 11/28/12 <br />Bids Due 12/20/12 <br />CMP expected 12/31/12 <br />VE Table of items, dated 10/11/12 was reviewed. <br />It was discussed that items on the VE list may require determination if they are educational related and therefore the school <br />committee should act or if they are an item of PBC direction. The PBC may vote to adopt VE items from this list and that there may <br />be items that require the School Committee to act upon as soon as they are prepared to do so. <br />Items #1 -7 were identified as previously accepted by PBC. <br />Motion by PBC that these items #1 -7 of the 10/11/12 VE table be incorporated into the project documents with an expected <br />savings of $652,400. <br />Motion: Phil 2 Peter Vote: 6 -0 -0 <br />Page 7 of 9 <br />