Lexington Permanent Building Committee <br />5/10/12 <br />02 August 2012 <br />Joe Riley discussion on Cost estimate comparative of Shawmut estimate and schematic design estimate. Next Friday (5/18/12) is <br />deliverable for DD estimate and reconciliation is scheduled for two days 5/20 and 5/21. Cost Estimates to be discussed in more <br />detail at next 5/24/12 PBC meeting. <br />• PBC discussed location of CM trailers would prefer to place them inside the fence. <br />• Question is there - Fence on top of retaining wall. <br />• Meeting with Fire Dept. and Building Inspector on 6/1. <br />• Met today 5/10/12 with Building Inspector and reviewed site logistics fully for building permit for retaining wall. Building <br />Inspector ok with foundation permit. <br />• Met with Shawmut and abatement contractors to walk through building. Shawmut will obtain numbers for abatement for <br />contractors to validate estimate. <br />• Met with Commissioning Agent and working on Owners Project Requirements with Pat. Process is underway. <br />• Meet with Hartwell Ave staff to talk about exporting site materials, environmental services and possibility importing fill <br />materials from Hartwell Ave. <br />• Shawmut working with Electric utility on temp power and new service issues. <br />7.37 DiNisco Update <br />5/10/12 <br />DiNisco reviewed/ update Building Elevations and Interior Design features of classrooms, hallways, cafeteria, gym, acoustical deck <br />in gym and cafeteria and tectum panels in gym. Gym floor linoleum product. <br />Reviewed samples of gym floor products preference is for linoleum. Waiting for test data on bounce factors. Reviewed samples of <br />rubber and linoleum for hallway and classroom floors. Rubber in stairs and linoleum throughout building. Waiting for test data for <br />sound deadening. <br />Estimated 23% savings on energy but lowering gas prices are dropping our percentage savings to 19 % + / -. LEED requires 20% <br />minimum cost savings. Waterless urinals are being looked at for additional savings, which save 40,000 gallons of water per year on <br />1.2 gal /flush. DiNisco working and confident in meeting LEED Silver. <br />Pat Goddard advised that ECC met recently and reviewed updated mechanical system information and energy analysis data from <br />RDK. The ECC requested additional information but supported that decisions made to date were appropriate. <br />DiNisco is working on Utility rebates with NSTAR and estimate $135,000; this is a work in progress. <br />7.38 DiNisco /Walsh Update5 /24/12 <br />DiNisco provided an update of work completed and status on overall project development. <br />Some discussion on the surveyors work and coordinating information to the tree warden who needs to know about trees (6 inch or <br />greater) impacted by the project. Discussion on any allowable use of Henessey Field. Brief recap of materials discussions to date. <br />Much of the discussion focused on reconciliation of the project cost estimates. Several Days has been spent on reconciling <br />quantities and unit prices between the estimates. Final reconciliation not yet available. Some discussions on a number of potential <br />value engineering items were highlighted if needed. <br />7.39 Collaborative Partners Project Update for 5/31/12 <br />5/31/12 <br />Presentation by CP on site logistics, enabling work. Shawmut reviewed site enabling work with options for cost deferments, i.e. <br />retaining wall, fill and storm water near parking lot. <br />CP discussed estimate review and will need Shawmut's numbers for 6/14/12 meeting. <br />There is potentially up to 5 million in budget disparity to the current estimate numbers. TOL position is that we should not be <br />looking to VE 5 million in program, the Design Team needs to identify why current estimates are different from schematic budget. <br />A VE list should be generated but needs to be subject to discussion with User, and others. <br />7.40 Update for 6/14/12 <br />6/14/12 <br />Value Engineering - $1,396,826 million in yes column after tonight's meeting- school department needs to firm up agreement <br />with these items that affect the education program. <br />Sandy discussed needing the list on 6/8 but never received it. <br />Page 8 of 10 <br />