Lexington Permanent Building Committee 02 August 2012 <br />Motion: Eric Brown 2 Carl Oldenburg Vote: 5 -0 <br />Motion to approve PCO /COR #59, 65, 67 and 33 which total $45,312.00 and for them to be incorporated into Change Order # 6 to <br />the TLT Construction Contract, <br />Motion: Eric Brown 2 Carl Oldenburg Vote: 5 -0 <br />Design Partnership provided update on status of Bridge Bowman project. Work inside progressing. Demo sub was slow and TLT <br />supplemented forces. DPC is documenting facts to position us well in case of a claim. TLT was to be at meeting tonight but could <br />not make it. Steel contractor backed out and TLT is signing with a new vendor. Boiler plant +/- 20 days behind schedule. <br />Recovery schedule by next Wednesday (7/18/12). Mason Starts 7/16/12 for boiler room walls. <br />4.34 Update <br />8/2/12 <br />Dave Capaldo updated on recovery schedule <br />• Steel Delivery buy out was delayed by TLT <br />• Demo. Sub significant factor in delay. <br />• Procurement of rooftop units delayed. 2RTU 8/17, 6 RTU 8/31 <br />Boiler Room steel delivery 8/18. <br />Peter J. spent time at 1 school on 8/2/12 to get understanding of status <br />VCT is damaged <br />Lockers are damaged <br />New cabinets are being delivered with a building that is not tight and subject to humidity. <br />Daedalus has been tracking deficiencies and DDP has been issuing letters <br />Exploring Options for start of school; Teachers 8/27 students 8/28 <br />Phase 2 Portions up and running would at least give them half a building to work with. Seems likely. Best choice is to find a way <br />to help TLT to get the job done. <br />*Filed Subs are refusing to do overtime because they say GC has not given them enough to work with. <br />Phase 2 option is not out of the question. <br />Nurses station and main office needed. Outside conditions deplorable, need to be cleaned up. <br />Clean Site <br />Life Safety <br />Complete clean up of Phase 2 <br />Nurse <br />Main Office <br />1. Define Absolute needs for 8/17 and 8/24. <br />2. Update Schedule <br />3. Meeting with Phil <br />4. Letter to Bond Counsel <br />Motion to authorize Town Counsel, Town Manager and Director of Facilities to utilize up to $200,000 as incentive to TLT for <br />completion of project. <br />Motion: Eric Brown 2 Carl Oldenburg 5 -0 -1 abstain <br />Motion to approve CO #7 in the amount of $893.00. <br />Motion: Eric Brown 2 Phil Coleman 6 -0 <br />Motion to approve COR #73 credit for $1734.00, COR #62 $20,258.00, CCD #7 $24,947.00, COR #86 $11,441.00, COR 384 <br />$11,487.00. <br />Motion: Eric Brown 2 Carl Oldenburg 6 -0 <br />We must retain School Department Network vendor to relocate network switches, add additional switches at each <br />location and re- establish network connection at each school. PO for Custom Computer Specialists $12,044.56 (total for <br />both schools) <br />Motion to approve PO for $12,044.56 <br />Motion: Eric Brown 2 Joe McWeeney 6 -0 <br />Application for payment #5 for $2,902,995.28. Motion to pay. <br />Motion: Eric Brown 2 Phil Coleman 6 -0 <br />Page 4 of 10 <br />