|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-06-14-PBC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Permanent Building Committee-PBC
>
Minutes
>
2010 - 2019
>
2012
>
2012-06-14-PBC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 1:59:11 PM
Creation date
11/8/2012 9:30:56 AM
Metadata
Fields
Template:
Archives
Keywords or Subject
Minutes - PBC - Permanent Building Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lexington Permanent Building Committee <br />14 June 2012 <br />7.39 Collaborative Partners Project Update for 5/31/12 <br />5/31/12 <br />Presentation by CP on site logistics, enabling work. Shawmut reviewed site enabling work with options for cost deferments, i.e. <br />retaining wall, fill and storm water near parking lot. <br />CP discussed estimate review and will need Shawmut's numbers for 6/14/12 meeting. <br />There is potentially up to 5 miliion in budget disparity to the current estimate numbers. TOL position is that we should not be <br />looking to VE 5 million in program, the Design Team needs to identify why current estimates are different from schematic budget. <br />A VE list should be generated but needs to be subject to discussion with User, and others. <br />7.40 Update for 6/14/12 <br />6/14/12 <br />$1,396,826 million in yes column after tonight's meeting- school department needs to firm up agreement with these items that <br />affect the education program. <br />Sandy discussed needing the list on 6/8 but never received it. <br />Des. Dev. Package — budget, and VE list due 6/26/12. There will be a LEED checklist in package, we should know if these items effect <br />the VE list. <br />PBC needs a target date (7/20/12) to be complete with VE list and have good numbers. <br />Discussion /concerns with Shawmut and continued services. <br />MaryAnn has concerns about the process. Information was requested on 6/8 but was only received information on 6/14 at <br />meeting. School Department needs to be an equal and prepared partner. <br />Stick with Shawmut to a point certain at last meeting Shawmut was to give us 1 GMP @ 60% CD. <br />If we chose to end further discussions with Shawmut we would have to give next CM an opportunity before we go to 149 bid. <br />Meaning we give CTA a set to price and see if we get agreeable GMP. If not we go to a bid process. <br />PBC directed Walsh to discuss with Shawmut the 2 million delta in soft costs below the line. Not 100% behind continuing to take <br />out of schools with such a delta. <br />7/12/12 meeting decision on Shawmut. <br />Next PBC meeting 6/28/12. <br />Meeting Adjourned <br />Motion to Adjourn 6/14/12 10:30 PM <br />Motion: Phil Coleman 2 Chuck Favazzo Unanimous <br />Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.