Lexington Permanent Building Committee 14 June 2012 <br />ECC was invited to the 4/26/12 PBC meeting to evaluate comparative data on Mechanical system options and energy model <br />updates. While only one member of the ECC was available for the meeting the Mechanical consultant was equally not able to <br />provide the documentation the facilities department was seeking. Updated material was requested from the engineer and Pat G. <br />will work with ECC to reach consensus on systems. <br />Designer briefly updated PBC on continued discussion of materials for fagade and general design features and building elevations. <br />PBC requested cost comparative data for limestone and similar materials proposed. DDP stated that the next working group <br />meeting would included continuation of design discussion. <br />7.35 Collaborative Partners Update for 4/26/12 <br />4/26/12 <br />Joe R. introduced members of the Shawmut team and provided a brief update on the status of estimating which included <br />Shawmut's first pass at an estimate on the project. CP was in the process of comparing the Shawmut estimate with that of the <br />schematic design and it was not ready for full discussion. PBC requested a systems summary estimate and Shawmut agreed. <br />7.36 Collaborative Partners Project Update for 5/10/12 <br />5/10/12 <br />Joe Riley discussion on Cost estimate comparative of Shawmut estimate and schematic design estimate. Next Friday (5/18/12) is <br />deliverable for DD estimate and reconciliation is scheduled for two days 5/20 and 5/21. Cost Estimates to be discussed in more <br />detail at next 5/24/12 PBC meeting. <br />• PBC discussed location of CM trailers would prefer to place them inside the fence. <br />• Question is there - Fence on top of retaining wall. <br />• Meeting with Fire Dept. and Building Inspector on 6/1. <br />• Met today 5/10/12 with Building Inspector and reviewed site logistics fully for building permit for retaining wall. Building <br />Inspector ok with foundation permit. <br />• Met with Shawmut and abatement contractors to walk through building. Shawmut will obtain numbers for abatement for <br />contractors to validate estimate. <br />• Met with Commissioning Agent and working on Owners Project Requirements with Pat. Process is underway. <br />• Meet with Hartwell Ave staff to talk about exporting site materials, environmental services and possibility importing fill <br />materials from Hartwell Ave. <br />• Shawmut working with Electric utility on temp power and new service issues. <br />7.37 DiNisco Update 5/10/12 <br />5/10/12 <br />DiNisco reviewed/ update Building Elevations and Interior Design features of classrooms, hallways, cafeteria, gym, acoustical deck <br />in gym and cafeteria and tectum panels in gym. Gym floor linoleum product. <br />Reviewed samples of gym floor products preference is for linoleum. Waiting for test data on bounce factors. Reviewed samples of <br />rubber and linoleum for hallway and classroom floors. Rubber in stairs and linoleum throughout building. Waiting for test data for <br />sound deadening. <br />Estimated 23% savings on energy but lowering gas prices are dropping our percentage savings to 19 % + / -. LEED requires 20% <br />minimum cost savings. Waterless urinals are being looked at for additional savings, which save 40,000 gallons of water per year on <br />1.2 gal /flush. DiNisco working and confident in meeting LEED Silver. <br />Pat Goddard advised that ECC met recently and reviewed updated mechanical system information and energy analysis data from <br />RDK. The ECC requested additional information but supported that decisions made to date were appropriate. <br />DiNisco is working on Utility rebates with NSTAR and estimate $135,000; this is a work in progress. <br />7.38 DiNisco /Walsh Update5 /24/12 <br />5/24/12 <br />DiNisco provided an update of work completed and status on overall project development. <br />Some discussion on the surveyors work and coordinating information to the tree warden who needs to know about trees (6 inch or <br />greater) impacted by the project. Discussion on any allowable use of Henessey Field. Brief recap of materials discussions to date. <br />Much of the discussion focused on reconciliation of the project cost estimates. Several Days has been spent on reconciling <br />quantities and unit prices between the estimates. Final reconciliation not yet available. Some discussion on a number of potential <br />value engineering items were highlighted if needed. <br />Page 7 of 8 <br />