Laserfiche WebLink
Page 4 <br />Minutes for the Meeting of December 17, 2008 <br /> <br />Bob Buckley, Steve Rice and Joe Zink were before the Board to informally advise them before filing a <br />warrant article for the approval of a higher floor area ration (FAR) at the Lexington Technology Park site. <br />Mr. Rice said they would be asking for an increase in the FAR and height for some buildings but would <br />keep within the building envelopes established. They would like to enlarge the #200 building and <br />possibly add a building. There were currently no specific plans. They were just requesting an increase in <br />capacity if needed. The current FAR is .15 and they would be asking to increase it to .24 FAR. <br /> <br />Board Concerns: <br />?? <br />Would this be for this Town Meeting? There was concern whether the Board has time to review this <br />proposal before the spring Town Meeting, especially with the work they are doing on Hartwell <br />Avenue and the Beal Companies’ proposal. <br />?? <br />This would be a Special Town Meeting at the end of May to ease the schedule, and a public hearing <br />could take place in April during Town Meeting. <br />?? <br />A PSDUP would be needed, since it is under a CD zone. Mr. Buckley said that they were looking at <br />the 100-200 parcel and the 500 parcel and it should be consistent with the PSDUP requirements. <br />?? <br />Mr. Rice said it would be 200,000 net square feet. <br /> <br />Mr. Norman Cohen, Chairman of the Board of Selectmen suggested that this would be brought to a <br />Special Town Meeting and he would urge the Beal Companies to go to Special Town Meeting as well. <br />This would allow work on Hartwell Avenue to be completed. <br /> <br />Audience Comments: <br />?? <br />Would the .24 FAR be for the building or whole development? Mr. Buckley responded it was for the <br />whole development. <br />?? <br />You are requesting a 60% increase before the traffic improvements promised with the TIF were <br />completed. Mr. Buckley said that they had put up the monies for mitigation and would address the <br />additional traffic. <br />?? <br />There needs to be something done about the signs along the road. Mr. Buckey said they had reduced <br />the number of signs, but this was still an active construction site. <br />?? <br />It was suggested that the developer improve the entrance and egress and possibly add an overpass to <br />get traffic off the local roads, then they might get a different reception. <br /> <br /> <br />