|
Lexington Home Page
|
Help
|
About
|
Browse
Search
2012-02-29-AC-min
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
MINUTES-REPORTS-COMMITTEES ARCHIVE
>
Appropriation Committee-AC
>
Minutes
>
2010-2019
>
2012
>
2012-02-29-AC-min
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 3:28:40 PM
Creation date
11/7/2012 1:09:22 PM
Metadata
Fields
Template:
Archives
Year
2012
Department
Town Clerk
Keywords or Subject
Minutes - AC - Appropriation Committee
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
February 29. 2012 <br />necessary scope of the project. The Appropriation Committee will be asked to render an <br />opinion on reducing the $550,000 request to $75,000. <br />Extraordinary School Repair Projects — ($610,000) — The individual projects within this article <br />will be voted together as a single line item to allow the DPF to smooth out unexpectedly higher <br />or lower bids. <br />Department of Public Facility Bid Documents — ($75,000) — The Public Facilities Department is <br />requesting an appropriation to cover the cost of bid documents for projects it believes will likely <br />be approved at Town Meeting. This will speed up the process of getting the work done and <br />enable the work to be done between the end of school in June and the beginning of the following <br />school year in August. <br />Hastings Natural Gas Conversion — ($45,000) — Conversion of the Hastings School heating <br />system to use natural gas instead of oil, which is projected to save between $9,000 and $20,000 <br />per year depending on the price of natural gas <br />Town Wide Facility Master Plan — ($65,000) — To appropriate money for an architect to take <br />individual facility plans previously done and integrate them into one Town wide Master Plan <br />Grounds Vehicle Replacement — ($80,000) <br />LHS Overcrowding — Phase 11 Renovations — ($400,000) — These renovations will move <br />information technology staff to the Central Office and convert space at the high school to <br />educational space. Other opportunities are being reviewed to identify more classroom space to <br />relieve overcrowding. <br />School Paving Program — Work would be concentrated on Harrington <br />Additional details about these projects can be found in the Brown Book in Section XI. Capital. <br />Minutes. Minutes of meetings held on 12/7/11 and 1/26/12 were approved with minor edits by a <br />vote of 7 -0 -0. <br />Adjourn. The meeting was adjourned at 10:29 p.m. <br />Respectfully submitted, <br />Jonina Schonfeld <br />Approved September 20, 2012 <br />M <br />
The URL can be used to link to this page
Your browser does not support the video tag.