February 29. 2012 <br />the various elements of the budget, and the Committee discussed a variety of factors that could <br />contribute to increased construction costs. Mr. Goddard will send detailed cost information to <br />Mr. Levine. <br />Mr. Addelson said Town Meeting would be asked to appropriate the entire $40.8 million cost of <br />the project, minus the $1.5 million already appropriated. For purposes of determining the correct <br />amount of an appropriation request, the MSBA reimbursement amount is treated the same way <br />debt would be treated. <br />The Town has already pre - qualified three contractors for the Estabrook construction. The Town <br />is using a "contract manager -at -risk" approach and will not necessarily take the lowest bid. The <br />MSBA also adds an extra 1% to the reimbursement rate (already included in the 32 %) when <br />towns take this approach. <br />White House Stabilization - The Warrant includes a request to appropriate a sum for the White <br />House stabilization project, although Mr. Goddard was not sure whether it would actually come <br />before Town Meeting. The Historic District Commission has ruled that the Town may demolish <br />the White House's wing but may not demolish the main house. Mr. Goddard reported that <br />stabilizing the White House by making the main house watertight, adding new shutters, a new <br />roof and repointing the foundation would cost $233,000. Demolishing the addition would cost <br />an additional $148,000 for a total of $381,000. Also included in the project cost is constructing a <br />new exterior wall after the demolition. Mr. Goddard observed that any future use of the building <br />would require almost all the stabilization work that is currently being proposed. <br />School Building Envelope and Systems — $150,000 will focus on Diamond exterior; $15,000 will <br />be for improving loading dock area at Central Office; remaining $50,000 will be reserved for <br />modifications that may be needed to accommodate late enrollment <br />Middle School Science Labs and Performing Art Spaces — Evaluation — ($35,000) — There is <br />concern that spaces may no longer adequately support educational program. <br />Diamond Energy Improvements — ($25,000) — An in -depth energy audit for Diamond, which <br />has high energy use. <br />Municipal Building Envelope and Systems — ($169,000) <br />Muzzey Senior Center Upgrade — Phase 1 Construction — ($561,518 CPA funds) — Involves <br />installing an elevator between the ground floor and basement and attending to additional <br />accessibility, safety, and energy efficiency needs. It is anticipated a subsequent request will be <br />made in FY2014 of approximately $480,000. <br />Cary Memorial Building Upgrades — Design — ($75,000) — To prepare design and development <br />documents and to gain more public input to ensure all proposed work has public benefit. The <br />CPC voted to approve the $550,000 originally requested for design development and <br />construction documents for a $7.7 million total project budget. The Selectmen, however, have <br />voted to approve only a more limited development budget that would help to determine the <br />