|
Lexington Home Page
|
Help
|
About
|
Browse
Search
LPS Master Plan 2009 DPC
Breadcrumb Navigation:
TownOfLexington-Public
>
WEB PUBLISHED-PUBLIC DOCUMENTS
>
BUILDINGS, LAND, UTILITIES & TRANS REPORTS
>
Lexington Public Schools
>
LPS Master Plan 2009 DPC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2012 1:00:36 PM
Creation date
10/10/2012 11:43:34 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 March 2009 <br />Middle School Implications: Projects have been undertaken at the Middle <br />Schools, and no major work is expected to be recommended in this study. What <br />the study does look at is the capacity of the middle schools relative to the <br />projected enrollments, with particular regard to the question of for how much <br />longer the modular classrooms are likely to remain in service. <br />High School Implications: The current Master Plan study does recommend <br />significant work at the High School. This is the result of both of programmatic <br />needs and of facilities needs. Major work was undertaken at the High School as <br />a result of the previous Master Plan study. However, a combination of <br />enrollment increases and educational program changes do leave the high school <br />in need of additional space. There are also facilities needs, due both to the <br />passage of time and to limitations imposed on the scope of prior projects, which <br />this report recommends need to be addressed. <br />Design Partnership of Cambridge <br />
The URL can be used to link to this page
Your browser does not support the video tag.